1508 W 29th St: 4 projects on record
City of Austin lists 4 filings across 4 projects at 1508 W 29th St, Austin, TX 78703 since January 15, 2024. The most recent, filed June 27, 2024, covers: “Construct new driveway approach of 12 ft and sidewalk of 12 lf and curb & gutter of 10 ft”.
Compiled from City of Austin records · updated Jun 27, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Jun 27, 2024
- since Jan 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 12 ft and sidewalk of 12 lf and curb & gutter of 10 ft
- AppliedJun 24, 2024
- IssuedJun 27, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 18, 2024
Passed final inspection Jul 18, 2024.
Permit & project history
4 projectsConstruct new driveway approach of 12 ft and sidewalk of 12 lf and curb & gutter of 10 ft
Construct new driveway approach of 12 ft and sidewalk of 12 lf and curb & gutter of 10 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2024-078824 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New swimming pool with ng heater (257 sq ft)
New swimming pool with ng heater (257 sq ft)
City of Austin permitPlumbing PermitFinal- Record
- 2023-137475 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New swimming pool with ng heater (257 sq ft)
New swimming pool with ng heater (257 sq ft)
City of Austin permitElectrical PermitFinal- Record
- 2023-137475 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New swimming pool with ng heater (257 sq ft)
New swimming pool with ng heater (257 sq ft)
City of Austin permitBuilding PermitFinal- Record
- 2023-137475 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1508 W 29th St
What is being built at 1508 W 29th St?
The latest filing (City of Austin permit 2024-078824 DS, June 27, 2024) covers construct new driveway approach of 12 ft and sidewalk of 12 lf and curb & gutter of 10 ft.
How many permits and filings does 1508 W 29th St have?
4 filings across 4 projects, from January 15, 2024 to June 27, 2024.
Is there other construction near 1508 W 29th St?
Yes. Nearby filings include 1511 W 29th St (for service on a rack with 200amp. ref: 2026-008934 ep, Sep 9, 2026); 1507 W 29th St (emergency repair (tree fell on service line) - replace 200 amp main service meterbase and riser. service provider - austin energy, May 13, 2026); 1502 W 29th St (replacement of complete existing central heat and air system with or without duct work, Jun 19, 2026).
How do I get alerts for new permits at 1508 W 29th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1511 W 29th StSep 9, 2026For service on a rack with 200amp. ref: 2026-008934 ep · 47 m away
- 1507 W 29th StMay 13, 2026Emergency repair (tree fell on service line) - replace 200 amp main service meterbase and riser. service provider - austin energy · 48 m away
- 1502 W 29th StJun 19, 2026Replacement of complete existing central heat and air system with or without duct work · 51 m away
- 1505 W 29th StOct 2, 2025Request to disconnect installation of 200 amp microgrid interconnection device on service with existing 200 amp meter can to remain · 55 m away
- 1505 W 30th StApr 10, 2026Add circuits to existing adu for a kitchenette. existing sub panel will be changed out to fit new circuits. we are also moving washer and dryer outlet locations. no other work is being done in the rest of the building · 65 m away
- 1515 W 29th StApr 24, 2026Install level 2 ev charger · 68 m away
- 1516 W 29th StAug 14, 2026Total demolition of detached shed 462.70 sq ft ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 70 m away
- 1517 W 29th StJul 9, 2026Repair of approximately 60ft of sewer yard line and installation of tankless water heater in attic · 82 m away
- 1517 W 30th StAug 11, 2025Install evse · 82 m away
- 1519 W 29th StJul 8, 2026Replace sewer line from the home to the city tap connection total length of sewer line is approximately 55 feet · 93 m away
- 1510 W 30th StSep 10, 2026Construct new driveway approach of 10 ft · 99 m away
- 1512 Mohle DrSep 28, 2026Replacement of complete existing central heat and air system with or without duct work · 105 m away
More pools in 78703.