1713 Summit Vw
Austin, TX 78703
1713 Summit Vw: 3 projects on record
City of Austin lists 3 filings across 3 projects at 1713 Summit Vw, Austin, TX 78703 since January 8, 2024. The most recent, filed April 9, 2024, covers: “Cap off water and waste water”.
Compiled from City of Austin records · updated Apr 9, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Apr 9, 2024
- since Jan 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCap off water and waste water
- AppliedAug 23, 2023
- IssuedApr 9, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 10, 2024
Passed final inspection Apr 10, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsCap off water and waste water
Cap off water and waste water
City of Austin permitPlumbing PermitFinal- Record
- 2024-041956 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of duplex 1906sqft circa 1948 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Total demolition of duplex 1906sqft circa 1948 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitFinal- Record
- 2024-001877 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of detached garage 528sqft circa 1948 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
Total demolition of detached garage 528sqft circa 1948 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage
City of Austin permitBuilding PermitFinal- Record
- 2024-001879 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1713 Summit Vw
What is being built at 1713 Summit Vw?
The latest filing (City of Austin permit 2024-041956 PP, April 9, 2024) covers cap off water and waste water.
How many permits and filings does 1713 Summit Vw have?
3 filings across 3 projects, from January 8, 2024 to April 9, 2024.
Is there other construction near 1713 Summit Vw?
Yes. Nearby filings include 1705 Summit Vw (* partial demolition* remodel master bathroom add carport, Aug 26, 2026); 1703 Summit Vw (1703 summit view, Jan 23, 2024); 1718 Summit Vw (install sink by outdoor bbq, Sep 4, 2026).
How do I get alerts for new permits at 1713 Summit Vw?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1705 Summit VwAug 26, 2026* partial demolition* remodel master bathroom add carport · 44 m away
- 1703 Summit VwJan 23, 20241703 summit view · 68 m away
- 1718 Summit VwSep 4, 2026Install sink by outdoor bbq · 71 m away
- 1510 Hartford RdNov 13, 2025Remplace swer yard line and chnge drains under the house · 76 m away
- 1706 Summit VwAug 12, 2026Like for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8) · 83 m away
- 1708 Enfield RdDec 10, 2024Repair gas leak in yard line and bring water heaters for units 5 6 7 and 9 up to code · 92 m away
- 1609 Hartford RdMay 23, 2025Replacement of an existing water heater replace existing gas water heater · 96 m away
- 1715 Cromwell HillAug 14, 2025Replacement of complete existing central heat and air system with or without duct work residential hvac change out. trane 17 seer 3 ton heat pump · 106 m away
- 1711 Cromwell HillMay 9, 2024Interior remodel remove: replace existing bath to include drain re-alignment and water supply to new fixture in master bathroom. 2.remove and replace existing vanity sinks and faucets to include drain assemblies in master bathroom. 3.re-configure shower to include new shower pan drain assembly faucets and water supply in masterbathroom. 4.re-configure water closet for new commode to include wastewater line and water supply. 5.re-configure hall bathroom as per plan and re-align wastewater line connection to shower commode and drain to include all water supply lines and fixtures. 6.re-configure utility room wastewater line for washing machine to include water supply. 7.replace fixtures in second hall bathroom. 8.replace fixtures in 1/2 bathroom on first level. 9.replace gas range dishwasher oven refrigerators sinks faucets to include water supplies drain assembly and gas line connections in kitchen. 10.replace gas water heater. electrical- 12/16/24 sm - delete old cloth wire throughout except for primary suite re-wired home · 110 m away
- 1506 Woodlawn BlvdNov 20, 2024Express: remodel to existing detached garage-new garage door new sheathing new siding new roof (shingles) non structural work · 114 m away
- 1700 Summit VwOct 2, 2026Express- foundation repair- installing 12 sonotube piers and steel piers · 117 m away
- 1715 Enfield RdDec 10, 2024Excavate a 35 tunnel to repair break to mainline sewer · 119 m away