1706 Summit Vw
Austin, TX 78703
48 residential windows to be replaced at 1706 Summit Vw
An Austin permit filed August 12, 2026, covers like-for-like replacement of 48 existing residential windows across eight multifamily units at 1706 Summit Vw. The permit specifies no structural changes, changes to rough openings, or changes to the building footprint.
Summarized from City of Austin records · updated Aug 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2026
- since Aug 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayLike for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8)
- AppliedAug 10, 2026
- IssuedAug 12, 2026
- WorkAug '26 – Feb '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectLike for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8)
Like for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8)
City of Austin permitBuilding PermitActive- Record
- 2026-105257 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1706 Summit Vw
What work is permitted at 1706 Summit Vw?
Austin permit 2026-105257 BP covers like-for-like replacement of 48 existing residential windows across units 1–8. It was filed August 12, 2026.
How many apartments are affected at 1706 Summit Vw?
The permit describes window replacement across eight multifamily units, identified as units 1–8.
Are the windows at 1706 Summit Vw being replaced or repaired?
The permit describes replacement of 48 existing residential windows on a like-for-like basis.
Will the work at 1706 Summit Vw change the building structure?
The permit says there will be no structural changes and no changes to the window rough openings.
Is the building footprint changing at 1706 Summit Vw?
No. The permit states that the work will not change the building footprint.
Also being built nearby
All of 78703- 1711 Cromwell HillMay 9, 2024Interior remodel remove: replace existing bath to include drain re-alignment and water supply to new fixture in master bathroom. 2.remove and replace existing vanity sinks and faucets to include drain assemblies in master bathroom. 3.re-configure shower to include new shower pan drain assembly faucets and water supply in masterbathroom. 4.re-configure water closet for new commode to include wastewater line and water supply. 5.re-configure hall bathroom as per plan and re-align wastewater line connection to shower commode and drain to include all water supply lines and fixtures. 6.re-configure utility room wastewater line for washing machine to include water supply. 7.replace fixtures in second hall bathroom. 8.replace fixtures in 1/2 bathroom on first level. 9.replace gas range dishwasher oven refrigerators sinks faucets to include water supplies drain assembly and gas line connections in kitchen. 10.replace gas water heater. electrical- 12/16/24 sm - delete old cloth wire throughout except for primary suite re-wired home · 36 m away
- 1715 Cromwell HillAug 14, 2025Replacement of complete existing central heat and air system with or without duct work residential hvac change out. trane 17 seer 3 ton heat pump · 48 m away
- 1608 Woodlawn BlvdNov 13, 2024Install approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required · 59 m away
- 1700 Summit VwOct 2, 2026Express- foundation repair- installing 12 sonotube piers and steel piers · 59 m away
- 1718 Summit VwSep 4, 2026Install sink by outdoor bbq · 62 m away
- 1609 Hartford RdMay 23, 2025Replacement of an existing water heater replace existing gas water heater · 63 m away
- 1705 Summit VwAug 26, 2026* partial demolition* remodel master bathroom add carport · 73 m away
- 1703 Summit VwJan 23, 20241703 summit view · 77 m away
- 1713 Summit VwApr 9, 2024Cap off water and waste water · 83 m away
- 1710 Cromwell HillJan 8, 2025T pole for the job · 88 m away
- 1708 Cromwell HillAug 26, 2026*partial demolition* interior remodel of two-story sfr · 96 m away
- 1605 Woodlawn BlvdOct 29, 2026Replace sewer yard line from house connection to city tap · 118 m away