1710 Cromwell Hill
Austin, TX 78703
Interior remodel permitted at 1710 Cromwell Hill
City of Austin permits filed from October 7 to November 5, 2024, describe an interior remodel at 1710 Cromwell Hill. The work includes reconfiguring interior walls, bathrooms, laundry and kitchen, plus replacing or adding doors and windows; a separate electrical permit for a temporary pole was filed January 8, 2025.
Summarized from City of Austin records · updated Jan 8, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Jan 8, 2025
- since Oct 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledT pole for the job
- AppliedDec 16, 2024
- IssuedJan 8, 2025
- WorkJan '25 – Jan '25
- Final inspectionJan 16, 2025
Passed final inspection Jan 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
5 projectsT pole for the job
T pole for the job
City of Austin permitElectrical PermitFinal- Record
- 2024-163954 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
City of Austin permitMechanical PermitFinal- Record
- 2024-092323 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
City of Austin permitPlumbing PermitFinal- Record
- 2024-092323 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
City of Austin permitElectrical PermitFinal- Record
- 2024-092323 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
Interior remodel: new and replaced doors and windows renovate interior reconfigure interior walls enlarge main bathroom and closet reconfigure bathrooms and laundry room relocate kitchen appliances make changes to electrical plumbing and mechanical as required for new configurations
City of Austin permitBuilding PermitFinal- Record
- 2024-092323 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1710 Cromwell Hill
What is being built at 1710 Cromwell Hill?
City permits describe an interior remodel, not a new building. The work includes changes to interior walls, bathrooms, laundry and kitchen.
When were permits filed for the remodel at 1710 Cromwell Hill?
The building permit, 2024-092323 BP, was filed October 7, 2024. Related electrical, plumbing and mechanical permits were filed October 8 and November 5, 2024.
What work is planned at 1710 Cromwell Hill in Austin?
The permit descriptions include new and replaced doors and windows, interior reconfiguration, an enlarged main bathroom and closet, and changes to bathrooms, laundry and kitchen appliances. Electrical, plumbing and mechanical changes are also listed.
Is 1710 Cromwell Hill a restaurant project?
The City of Austin permit descriptions provided for this address describe residential interior remodeling, including kitchen and bathroom changes. They do not identify a restaurant.
What is the January 2025 permit for 1710 Cromwell Hill?
Electrical permit 2024-163954 EP, filed January 8, 2025, describes a temporary pole for the job. Its status is listed as final.
Also being built nearby
All of 78703- 1708 Cromwell HillAug 26, 2026*partial demolition* interior remodel of two-story sfr · 32 m away
- 1711 Cromwell HillMay 9, 2024Interior remodel remove: replace existing bath to include drain re-alignment and water supply to new fixture in master bathroom. 2.remove and replace existing vanity sinks and faucets to include drain assemblies in master bathroom. 3.re-configure shower to include new shower pan drain assembly faucets and water supply in masterbathroom. 4.re-configure water closet for new commode to include wastewater line and water supply. 5.re-configure hall bathroom as per plan and re-align wastewater line connection to shower commode and drain to include all water supply lines and fixtures. 6.re-configure utility room wastewater line for washing machine to include water supply. 7.replace fixtures in second hall bathroom. 8.replace fixtures in 1/2 bathroom on first level. 9.replace gas range dishwasher oven refrigerators sinks faucets to include water supplies drain assembly and gas line connections in kitchen. 10.replace gas water heater. electrical- 12/16/24 sm - delete old cloth wire throughout except for primary suite re-wired home · 55 m away
- 1715 Cromwell HillAug 14, 2025Replacement of complete existing central heat and air system with or without duct work residential hvac change out. trane 17 seer 3 ton heat pump · 62 m away
- 1608 Woodlawn BlvdNov 13, 2024Install approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required · 82 m away
- 1609 Hartford RdMay 23, 2025Replacement of an existing water heater replace existing gas water heater · 87 m away
- 1706 Summit VwAug 12, 2026Like for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8) · 88 m away
- 1704 Hartford RdSep 8, 2025(keeven weston) - installation of circuit for elec. vehicle charging station - esip · 99 m away
- 1702 Hartford RdApr 14, 2026Gas test only 4/15/26 im no meter at property new gas line to pool heater and stove ran in crawlspace · 100 m away
- 1718 Summit VwSep 4, 2026Install sink by outdoor bbq · 109 m away
- 1700 Summit VwOct 2, 2026Express- foundation repair- installing 12 sonotube piers and steel piers · 116 m away
- 1609 Woodlawn BlvdFeb 24, 202540ft water line replacement/repair · 130 m away
- 1607 Woodlawn BlvdAug 10, 2026Addition to existing 1-story single-family residential to include: 2nd story addition of 2 bedroom 2 bath with balcony/ covered patio/ outdoor kitchen with fire place · 139 m away
More restaurants in 78703.