1608 Woodlawn Blvd
Austin, TX 78703
1608 Woodlawn Blvd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1608 Woodlawn Blvd, Austin, TX 78703 since July 29, 2024. The most recent, filed November 13, 2024, covers: “Install approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required”.
Compiled from City of Austin records · updated Nov 13, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 13, 2024
- since Jul 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required
- AppliedNov 6, 2024
- IssuedNov 13, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 15, 2024
Passed final inspection Nov 15, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required
Install approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required
City of Austin permitPlumbing PermitFinal- Record
- 2024-148660 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
**request to disconnect** install 200 amp ats and 38kw generator
**request to disconnect** install 200 amp ats and 38kw generator
City of Austin permitElectrical PermitFinal- Record
- 2024-092464 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1608 Woodlawn Blvd
What is being built at 1608 Woodlawn Blvd?
The latest filing (City of Austin permit 2024-148660 PP, November 13, 2024) covers install approximately 10 of gas piping from gas meter to new whole house generator. some excavation and underground piping required.
How many permits and filings does 1608 Woodlawn Blvd have?
2 filings across 2 projects, from July 29, 2024 to November 13, 2024.
Is there other construction near 1608 Woodlawn Blvd?
Yes. Nearby filings include 1700 Summit Vw (express- foundation repair- installing 12 sonotube piers and steel piers, Oct 2, 2026); 1706 Summit Vw (like for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8), Aug 12, 2026); 1711 Cromwell Hill (interior remodel remove: replace existing bath to include drain re-alignment and water supply to new fixture in master bathroom. 2.remove and replace existing vanity sinks and faucets to include drain assemblies in master bathroom. 3.re-configure shower to include new shower pan drain assembly faucets and water supply in masterbathroom. 4.re-configure water closet for new commode to include wastewater line and water supply. 5.re-configure hall bathroom as per plan and re-align wastewater line connection to shower commode and drain to include all water supply lines and fixtures. 6.re-configure utility room wastewater line for washing machine to include water supply. 7.replace fixtures in second hall bathroom. 8.replace fixtures in 1/2 bathroom on first level. 9.replace gas range dishwasher oven refrigerators sinks faucets to include water supplies drain assembly and gas line connections in kitchen. 10.replace gas water heater. electrical- 12/16/24 sm - delete old cloth wire throughout except for primary suite re-wired home, May 9, 2024).
How do I get alerts for new permits at 1608 Woodlawn Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1700 Summit VwOct 2, 2026Express- foundation repair- installing 12 sonotube piers and steel piers · 39 m away
- 1706 Summit VwAug 12, 2026Like for like replacement of 48 existing residential windows across 8 multi-family units with no structural changes no change to rough openings and no change to building footprint. (units 1-8) · 59 m away
- 1711 Cromwell HillMay 9, 2024Interior remodel remove: replace existing bath to include drain re-alignment and water supply to new fixture in master bathroom. 2.remove and replace existing vanity sinks and faucets to include drain assemblies in master bathroom. 3.re-configure shower to include new shower pan drain assembly faucets and water supply in masterbathroom. 4.re-configure water closet for new commode to include wastewater line and water supply. 5.re-configure hall bathroom as per plan and re-align wastewater line connection to shower commode and drain to include all water supply lines and fixtures. 6.re-configure utility room wastewater line for washing machine to include water supply. 7.replace fixtures in second hall bathroom. 8.replace fixtures in 1/2 bathroom on first level. 9.replace gas range dishwasher oven refrigerators sinks faucets to include water supplies drain assembly and gas line connections in kitchen. 10.replace gas water heater. electrical- 12/16/24 sm - delete old cloth wire throughout except for primary suite re-wired home · 64 m away
- 1609 Woodlawn BlvdFeb 24, 202540ft water line replacement/repair · 66 m away
- 1607 Woodlawn BlvdAug 10, 2026Addition to existing 1-story single-family residential to include: 2nd story addition of 2 bedroom 2 bath with balcony/ covered patio/ outdoor kitchen with fire place · 66 m away
- 1708 Cromwell HillAug 26, 2026*partial demolition* interior remodel of two-story sfr · 68 m away
- 1605 Woodlawn BlvdOct 29, 2026Replace sewer yard line from house connection to city tap · 72 m away
- 1710 Cromwell HillJan 8, 2025T pole for the job · 82 m away
- 1603 Woodlawn BlvdJul 29, 20151603 woodlawn blvd · 82 m away
- 1715 Cromwell HillAug 14, 2025Replacement of complete existing central heat and air system with or without duct work residential hvac change out. trane 17 seer 3 ton heat pump · 87 m away
- 1601 Woodlawn BlvdOct 2, 2026Base: installing a backup battery system and additional meter socket · 95 m away
- 1703 Summit VwJan 23, 20241703 summit view · 103 m away