2007 Woodmont Ave
Austin, TX 78703
Heating, air and gas-line work permitted at 2007 Woodmont Ave
City of Austin permits indicate replacement of the existing central heating and air system and repair or replacement of a gas pipe at this residential address. The gas-pipe permit was filed September 11, 2025, and the mechanical permit was filed October 17, 2025.
Summarized from City of Austin records · updated Oct 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 17, 2025
- since Sep 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 9, 2025
- IssuedOct 17, 2025
- WorkOct '25 – Jan '26
- Final inspectionJan 16, 2026
Passed final inspection Jan 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-131383 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair/replace gas pipe (gas company pulled meter)
Repair/replace gas pipe (gas company pulled meter)
City of Austin permitPlumbing PermitFinal- Record
- 2025-113950 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2007 Woodmont Ave
What work is happening at 2007 Woodmont Ave?
City of Austin permits indicate work on the existing central heating and air system and a gas pipe. The records describe system replacement and gas-pipe repair or replacement.
Is a new home being built at 2007 Woodmont Ave?
The available permits describe work on existing heating, air-conditioning and gas systems, not construction of a new home.
When was the work at 2007 Woodmont Ave permitted?
The gas-pipe permit, 2025-113950 PP, was filed September 11, 2025. The mechanical permit, 2025-131383 MP, was filed October 17, 2025.
What does permit 2025-131383 MP cover?
The City of Austin mechanical permit describes replacement of the complete existing central heat and air system, with or without duct work. It was filed October 17, 2025.
What does permit 2025-113950 PP cover?
The City of Austin plumbing permit describes repair or replacement of a gas pipe after the gas company pulled the meter. It was filed September 11, 2025.
Also being built nearby
All of 78703- 2002 Woodmont AveSep 8, 2026Main panel changeout · 43 m away
- 1702 Winsted LnMar 5, 2024New pool. 410 sq ft swimming pool with autofill and ng heater · 64 m away
- 1704 Winsted LnJan 8, 2026We are looking to upgrade main electrical panel and also increase service size to 200a (currenty 125a) · 78 m away
- 1701 Sharon LnOct 14, 2026Install 26kw kohler generator with a 200ats · 87 m away
- 1705 Sharon LnOct 26, 2026Generator gas line · 110 m away
- 1604 Sharon LnOct 27, 2026Pool- [separate demolition permit] demolition existing pool deck and concrete patios. rebuild pool in the same location · 114 m away
- 1803 Winsted LnJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 2005 Griswold LnMay 9, 2025Replace sewer yard line from house connection to city tap · 139 m away
- 2007 Griswold LnMay 9, 2025Replace sewer yard line from house connection to city tap · 146 m away
- 2001 Bridle PathSep 17, 2025Cap off water/wastewater · 147 m away
- 1805 Winsted LnAug 28, 2025Whole home repipe as well as drain repipe under a pier and beam home · 155 m away
- 1601 Forest TrlMar 17, 2025Remodel existing master bedroom bathroom a guest bedroom and bathroom. no exterior work outside of replacement of windows size for size · 162 m away