2202 Forest Trl
Austin, TX 78703
2202 Forest Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 2202 Forest Trl, Austin, TX 78703. The most recent, filed June 20, 2024, covers: “Replacement of complete existing central heat and air system”.
Compiled from City of Austin records · updated Jun 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2024
- since Jun 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system
- AppliedJun 19, 2024
- IssuedJun 20, 2024
- WorkJun '24 – Nov '24
- Final inspectionNov 19, 2024
Passed final inspection Nov 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system
Replacement of complete existing central heat and air system
City of Austin permitMechanical PermitFinal- Record
- 2024-077176 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2202 Forest Trl
What is being built at 2202 Forest Trl?
The latest filing (City of Austin permit 2024-077176 MP, June 20, 2024) covers replacement of complete existing central heat and air system.
How many permits and filings does 2202 Forest Trl have?
1 filing across 1 project, from June 20, 2024 to June 20, 2024.
Is there other construction near 2202 Forest Trl?
Yes. Nearby filings include 2200 Forest Trl (remodel and addition to existing sfr. the additional conditioned area added to both the first and second floors. a covered terrace to added to ground floor revised ** 10/25/24 sm - full gut remodel except for kitchen and full bath fixtures and countertops. new primary bath and powder bath. all new ductwork and hvac, Nov 4, 2024); 2201 Stamford Ln (base: installing a backup battery system and additional meter socket, Aug 13, 2026); 2208 Forest Trl (construct new driveway approach of 16 ft and curb & gutter of 15 ft. no sidewalk inspection per plan review, Nov 10, 2026).
How do I get alerts for new permits at 2202 Forest Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2200 Forest TrlNov 4, 2024Remodel and addition to existing sfr. the additional conditioned area added to both the first and second floors. a covered terrace to added to ground floor revised ** 10/25/24 sm - full gut remodel except for kitchen and full bath fixtures and countertops. new primary bath and powder bath. all new ductwork and hvac · 16 m away
- 2201 Stamford LnAug 13, 2026Base: installing a backup battery system and additional meter socket · 39 m away
- 2208 Forest TrlNov 10, 2026Construct new driveway approach of 16 ft and curb & gutter of 15 ft. no sidewalk inspection per plan review · 41 m away
- 2207 Forest TrlMay 22, 2024Express: replace 1 window like for like · 51 m away
- 2201 Forest TrlSep 16, 2026Replacement of an existing water heater replacing gas water heater with similar model · 57 m away
- 3007 Windsor RdAug 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton gas horizontal (upstairs) · 60 m away
- 2107 Forest TrlJun 12, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton ac system and supply & return plenum · 65 m away
- 3009 Windsor RdJan 30, 2025Replace an existing option generator and automatic transfer switch and add a docking station on the new concrete equipment pad for the existing fire station. site plan exemption not require less than 100 sq ft · 73 m away
- 2202 Stamford LnApr 3, 2024Replace sewer yard line from house connection to city tap · 76 m away
- 2204 Stamford LnJan 26, 2024Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 2101 Stamford LnApr 9, 2026Interior remodel: interior wall and stair reconfigurations remodeling kitchen laundry bathrooms and bedrooms new windows and doors · 77 m away
- 2106 Stamford LnJun 10, 2025Run a new 1-1/4 gas line from the meter down the side of the house and up to the attic · 87 m away