2204 W 9th St
Austin, TX 78703
Gas line work permitted at 2204 W 9th St
A City of Austin plumbing permit indicates gas line work at the residence at 2204 W 9th St, not a new building project. The permit was filed December 10, 2025, for extending a black iron gas line at a cabinet wall, reconnecting a range, and testing the unit for leaks.
Summarized from City of Austin records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExtend black iron gas line trough cabinet wall and reconnect range. will also test entire unit for leaks
- AppliedDec 7, 2025
- IssuedDec 10, 2025
- WorkDec '25 – Dec '25
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectExtend black iron gas line trough cabinet wall and reconnect range. will also test entire unit for leaks
Extend black iron gas line trough cabinet wall and reconnect range. will also test entire unit for leaks
City of Austin permitPlumbing PermitFinal- Record
- 2025-155200 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2204 W 9th St
What is being built at 2204 W 9th St?
The City of Austin record describes plumbing work at a residence, not new construction. The work includes extending a black iron gas line, reconnecting a range, and testing for leaks.
What work was permitted at 2204 W 9th St in Austin?
Permit 2025-155200 PP covers extending a black iron gas line at a cabinet wall, reconnecting a range, and testing the unit for leaks.
When was the permit filed for 2204 W 9th St?
The City of Austin filed plumbing permit 2025-155200 PP on December 10, 2025.
Is a new home being built at 2204 W 9th St?
The available permit record does not indicate new home construction. It describes gas line work and a range reconnection at a residence.
Does the permit at 2204 W 9th St include a leak test?
Yes. The permit description says the entire unit will be tested for leaks after the gas line work and range reconnection.
Also being built nearby
All of 78703- 2200 W 9th StSep 3, 2025Installing 10.32 kw of solar capacity + 13.5 kwh ess on an existing residence · 24 m away
- 2201 W 9th StApr 11, 2024External mpu with surge protection · 29 m away
- 802 Meriden LnApr 14, 2026Express: remove and replace 14 windows like for like · 40 m away
- 717 Meriden LnAug 3, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 70 m away
- 2304 W 8th StApr 20, 2025Install irrigation system · 79 m away
- 716 Upson StMar 11, 2025Emergency request replace meter can and riser · 85 m away
- 715 Meriden LnJul 10, 2024Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 2309 W 9th StAug 6, 2026Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 713 Meriden LnNov 4, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4bath] with habitable attic basement and attached garage · 101 m away
- 2119 W 10th StMar 15, 2026New construction in-ground pool · 113 m away
- 2307 W 8th StJan 30, 2026Whole home water repipe to about 20 fixtures along with 30ft water line replacement · 115 m away
- 2308 W 9th StMay 20, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 116 m away