2309 W 9th St
Austin, TX 78703
Central HVAC system replacement permitted at 2309 W 9th St
A City of Austin permit filed August 6, 2026, indicates replacement of the existing central heating and air system at 2309 W 9th St. The permit is active; an earlier permit for the same type of replacement was finalized in 2023.
Summarized from City of Austin records · updated Aug 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 6, 2026
- since Aug 6, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 13, 2026
- IssuedAug 6, 2026
- WorkAug '26 – Feb '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-089662 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-078506 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2309 W 9th St
What is happening at 2309 W 9th St in Austin?
A City of Austin permit indicates replacement of the existing central heat and air system, with or without duct work. Permit 2026-089662 MP was filed August 6, 2026, and is active.
Is a new building being constructed at 2309 W 9th St?
The available permit describes replacement of an existing central heating and air system, not construction of a new building. Permit 2026-089662 MP was filed August 6, 2026.
When was the HVAC permit filed for 2309 W 9th St?
The current mechanical permit, 2026-089662 MP, was filed August 6, 2026. Its status is active.
Has HVAC work been permitted at 2309 W 9th St before?
Yes. City permit 2023-078506 MP, filed June 30, 2023, also described replacement of the complete existing central heat and air system. That permit is finalized.
What does permit 2026-089662 MP cover?
The permit covers replacement of the complete existing central heat and air system, with or without duct work. It was filed August 6, 2026, and is listed as active.
Also being built nearby
All of 78703- 2315 W 9th StSep 22, 2026Replacement of complete existing central heat and air system with or without duct work · 36 m away
- 2308 W 9th StMay 20, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 43 m away
- 2304 W 8th StApr 20, 2025Install irrigation system · 63 m away
- 2201 W 9th StApr 11, 2024External mpu with surge protection · 68 m away
- 2319 W 9th StMar 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system (downstairs) · 68 m away
- 802 Meriden LnApr 14, 2026Express: remove and replace 14 windows like for like · 77 m away
- 2316 W 9th StMay 12, 2025Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights shed is 160 square feet · 81 m away
- 2321 W 9th StMar 18, 2026Addition of covered rear wood deck. see ep 2025 015600 · 83 m away
- 2204 W 9th StDec 10, 2025Extend black iron gas line trough cabinet wall and reconnect range. will also test entire unit for leaks · 93 m away
- 2307 W 8th StJan 30, 2026Whole home water repipe to about 20 fixtures along with 30ft water line replacement · 95 m away
- 2200 W 9th StSep 3, 2025Installing 10.32 kw of solar capacity + 13.5 kwh ess on an existing residence · 96 m away
- 901 Possum TrotNov 13, 2024Express: replace siding replace windows like for like · 99 m away