2208 Hartford Rd
Austin, TX 78703
2208 Hartford Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2208 Hartford Rd, Austin, TX 78703. The most recent, filed August 26, 2024, covers: “Replace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard”.
Compiled from City of Austin records · updated Aug 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 26, 2024
- since Aug 26, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard
- AppliedAug 21, 2024
- IssuedAug 26, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 3, 2024
Passed final inspection Sep 3, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard
Replace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard
City of Austin permitPlumbing PermitFinal- Record
- 2024-106571 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2208 Hartford Rd
What is being built at 2208 Hartford Rd?
The latest filing (City of Austin permit 2024-106571 PP, August 26, 2024) covers replace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard.
How many permits and filings does 2208 Hartford Rd have?
1 filing across 1 project, from August 26, 2024 to August 26, 2024.
Is there other construction near 2208 Hartford Rd?
Yes. Nearby filings include 2206 Hartford Rd (construct new driveway approach of 12 ft and curb & gutter of 7 ft, Nov 20, 2023); 1625 Watchhill Rd (install new 5.95 kw rooftop solar system and 13.51kw energy storage system for existing residential only, Oct 10, 2025); 2209 Newfield Ln (replacement of complete existing central heat and air system with or without duct work install new 2.5-ton goodman 14.3-seer cooling ac & gas heating system install new 2-ton goodman 14.3-seer electric ac & gas heating system install new 2-ton goodman 14.3-seer heat pump ac & heating system, Jun 9, 2026).
How do I get alerts for new permits at 2208 Hartford Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2206 Hartford RdNov 20, 2023Construct new driveway approach of 12 ft and curb & gutter of 7 ft · 17 m away
- 1625 Watchhill RdOct 10, 2025Install new 5.95 kw rooftop solar system and 13.51kw energy storage system for existing residential only · 47 m away
- 2209 Newfield LnJun 9, 2026Replacement of complete existing central heat and air system with or without duct work install new 2.5-ton goodman 14.3-seer cooling ac & gas heating system install new 2-ton goodman 14.3-seer electric ac & gas heating system install new 2-ton goodman 14.3-seer heat pump ac & heating system · 50 m away
- 2207 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 54 m away
- 2211 Newfield LnApr 24, 2026Replace sewer yard line from house connection to city tap · 54 m away
- 1804 Polo RdDec 3, 2025Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 2213 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 59 m away
- 1623 Watchhill RdJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 2300 Hartford RdApr 4, 2026New pool · 72 m away
- 1624 Northumberland RdAug 27, 2024Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 1808 Watchhill RdJul 7, 2026Replace sewer yard line from house connection to city tap · 90 m away
- 2208 Newfield LnJul 22, 2026Replace sewer yard line from house connection to city tap · 98 m away