Sewer line replacement and home repairs at 2211 Newfield Ln

City of Austin permits indicate repairs and utility upgrades at the existing residence, not a documented new home build. The latest filing, dated April 24, 2026, covers replacing the sewer yard line from the house connection to the city tap (permit 2026-048513 PP). Earlier permits cover a drain-line repair, a generator and gas-line work, and an electrical service upgrade.

Summarized from City of Austin records · updated Apr 24, 2026

Projects
5
5 filings
Latest filing
Apr 24, 2026
since Dec 11, 2023
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replace sewer yard line from house connection to city tap

  1. AppliedApr 20, 2026
  2. IssuedApr 24, 2026
  3. WorkApr '26 – Apr '27
  4. Final inspection
58% through of the permit windowApr 24, 2026 → Apr 19, 2027

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Replace sewer yard line from house connection to city tap

    Replace sewer yard line from house connection to city tap

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Pier & beam repair 35 of main drain line under house

    Pier & beam repair 35 of main drain line under house

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. *** per pc - install a 1-1/2in dedicated gas line to the generator which is on the opposite side of the gas meter. we ran the new line under the crawl space and strapped it up as well. we also added a regulator 3-4ft from the generator. tested the work to find no leaks and painted all the exposed pipe

    *** per pc - install a 1-1/2in dedicated gas line to the generator which is on the opposite side of the gas meter. we ran the new line under the crawl space and strapped it up as well. we also added a regulator 3-4ft from the generator. tested the work to find no leaks and painted all the exposed pipe

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Request to disconnect addition of 24kw generator and transfer switch only to existing 200amp service

    Request to disconnect addition of 24kw generator and transfer switch only to existing 200amp service

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Request to disconnect service only upgrade of 125amp overhead service with cloth riser to a new 200amp

    Request to disconnect service only upgrade of 125amp overhead service with cloth riser to a new 200amp

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2211 Newfield Ln

What is being built at 2211 Newfield Ln?

The permit records show repairs and utility upgrades at an existing residence, rather than a documented new build. The latest permit covers replacing the sewer yard line.

Is a new home being built at 2211 Newfield Ln?

The records provided do not show a new home construction permit. They list plumbing and electrical work at the residence.

When was the sewer line replacement permitted at 2211 Newfield Ln?

The sewer yard line replacement permit, 2026-048513 PP, was filed April 24, 2026. It covers the line from the house connection to the city tap.

What plumbing work is permitted at 2211 Newfield Ln?

Permits include a sewer yard line replacement filed April 24, 2026, and a repair to 35 feet of the main drain line under the house, filed March 11, 2026.

Was a generator added at 2211 Newfield Ln?

A City of Austin electrical permit filed October 9, 2024, describes adding a 24-kilowatt generator and transfer switch to the existing 200-amp service. A later plumbing permit covered installing a dedicated gas line to the generator.

Was the electrical service upgraded at 2211 Newfield Ln?

Yes. Permit 2023-157222 EP, filed December 11, 2023, describes upgrading the overhead service from 125 amps to 200 amps.