Sewer line replacement and home repairs at 2211 Newfield Ln
City of Austin permits indicate repairs and utility upgrades at the existing residence, not a documented new home build. The latest filing, dated April 24, 2026, covers replacing the sewer yard line from the house connection to the city tap (permit 2026-048513 PP). Earlier permits cover a drain-line repair, a generator and gas-line work, and an electrical service upgrade.
Summarized from City of Austin records · updated Apr 24, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Apr 24, 2026
- since Dec 11, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplace sewer yard line from house connection to city tap
- AppliedApr 20, 2026
- IssuedApr 24, 2026
- WorkApr '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
5 projectsReplace sewer yard line from house connection to city tap
Replace sewer yard line from house connection to city tap
City of Austin permitPlumbing PermitActive- Record
- 2026-048513 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Pier & beam repair 35 of main drain line under house
Pier & beam repair 35 of main drain line under house
City of Austin permitPlumbing PermitFinal- Record
- 2026-029327 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*** per pc - install a 1-1/2in dedicated gas line to the generator which is on the opposite side of the gas meter. we ran the new line under the crawl space and strapped it up as well. we also added a regulator 3-4ft from the generator. tested the work to find no leaks and painted all the exposed pipe
*** per pc - install a 1-1/2in dedicated gas line to the generator which is on the opposite side of the gas meter. we ran the new line under the crawl space and strapped it up as well. we also added a regulator 3-4ft from the generator. tested the work to find no leaks and painted all the exposed pipe
City of Austin permitPlumbing PermitFinal- Record
- 2025-001820 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect addition of 24kw generator and transfer switch only to existing 200amp service
Request to disconnect addition of 24kw generator and transfer switch only to existing 200amp service
City of Austin permitElectrical PermitFinal- Record
- 2024-135015 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect service only upgrade of 125amp overhead service with cloth riser to a new 200amp
Request to disconnect service only upgrade of 125amp overhead service with cloth riser to a new 200amp
City of Austin permitElectrical PermitFinal- Record
- 2023-157222 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2211 Newfield Ln
What is being built at 2211 Newfield Ln?
The permit records show repairs and utility upgrades at an existing residence, rather than a documented new build. The latest permit covers replacing the sewer yard line.
Is a new home being built at 2211 Newfield Ln?
The records provided do not show a new home construction permit. They list plumbing and electrical work at the residence.
When was the sewer line replacement permitted at 2211 Newfield Ln?
The sewer yard line replacement permit, 2026-048513 PP, was filed April 24, 2026. It covers the line from the house connection to the city tap.
What plumbing work is permitted at 2211 Newfield Ln?
Permits include a sewer yard line replacement filed April 24, 2026, and a repair to 35 feet of the main drain line under the house, filed March 11, 2026.
Was a generator added at 2211 Newfield Ln?
A City of Austin electrical permit filed October 9, 2024, describes adding a 24-kilowatt generator and transfer switch to the existing 200-amp service. A later plumbing permit covered installing a dedicated gas line to the generator.
Was the electrical service upgraded at 2211 Newfield Ln?
Yes. Permit 2023-157222 EP, filed December 11, 2023, describes upgrading the overhead service from 125 amps to 200 amps.
Also being built nearby
All of 78703- 2209 Newfield LnJun 9, 2026Replacement of complete existing central heat and air system with or without duct work install new 2.5-ton goodman 14.3-seer cooling ac & gas heating system install new 2-ton goodman 14.3-seer electric ac & gas heating system install new 2-ton goodman 14.3-seer heat pump ac & heating system · 15 m away
- 2213 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 15 m away
- 2207 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 29 m away
- 2212 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 47 m away
- 2208 Newfield LnJul 22, 2026Replace sewer yard line from house connection to city tap · 49 m away
- 1808 Watchhill RdJul 7, 2026Replace sewer yard line from house connection to city tap · 52 m away
- 2208 Hartford RdAug 26, 2024Replace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard · 54 m away
- 2206 Newfield LnApr 17, 2026Replace sewer yard line from house connection to city tap · 56 m away
- 1900 Watchhill RdJun 1, 2026Replace sewer yard line from house connection to city tap · 58 m away
- 2206 Hartford RdNov 20, 2023Construct new driveway approach of 12 ft and curb & gutter of 7 ft · 64 m away
- 2300 Hartford RdApr 4, 2026New pool · 65 m away
- 2204 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 68 m away