2303 Hartford Rd
Austin, TX 78703
2303 Hartford Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2303 Hartford Rd, Austin, TX 78703. The most recent, filed February 20, 2025, covers: “New main panel new meter box and riser 200 amp”.
Compiled from City of Austin records · updated Feb 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 20, 2025
- since Feb 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNew main panel new meter box and riser 200 amp
- AppliedJan 28, 2025
- IssuedFeb 20, 2025
- !WorkFeb '25 – Aug '25
- Final inspection
Marked expired Aug 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectNew main panel new meter box and riser 200 amp
New main panel new meter box and riser 200 amp
City of Austin permitElectrical PermitExpired- Record
- 2025-010987 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2303 Hartford Rd
What is being built at 2303 Hartford Rd?
The latest filing (City of Austin permit 2025-010987 EP, February 20, 2025) covers new main panel new meter box and riser 200 amp.
How many permits and filings does 2303 Hartford Rd have?
1 filing across 1 project, from February 20, 2025 to February 20, 2025.
Is there other construction near 2303 Hartford Rd?
Yes. Nearby filings include 2305 Hartford Rd (installation of 60kw generator with 600 ats, Jul 18, 2024); 2304 Woodlawn Blvd (approximately 10 of gas piping from the gas meter to a new whole house generator. some trenching and underground piping required, Jul 24, 2025); 2300 Hartford Rd (new pool, Apr 4, 2026).
How do I get alerts for new permits at 2303 Hartford Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2305 Hartford RdJul 18, 2024Installation of 60kw generator with 600 ats · 32 m away
- 2304 Woodlawn BlvdJul 24, 2025Approximately 10 of gas piping from the gas meter to a new whole house generator. some trenching and underground piping required · 48 m away
- 2300 Hartford RdApr 4, 2026New pool · 60 m away
- 2300 Woodlawn BlvdAug 12, 2026Express- repair existing foundation · 62 m away
- 1625 Watchhill RdOct 10, 2025Install new 5.95 kw rooftop solar system and 13.51kw energy storage system for existing residential only · 79 m away
- 1623 Watchhill RdJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 1808 Watchhill RdJul 7, 2026Replace sewer yard line from house connection to city tap · 98 m away
- 2308 Woodlawn BlvdAug 1, 2025Replacement of condenser only replaced condenser under warranty · 106 m away
- 2213 Newfield LnApr 21, 2026Replace sewer yard line from house connection to city tap · 112 m away
- 2208 Hartford RdAug 26, 2024Replace 55 ft galvanized piping from meter to home. no tunneling. replace the water line in the yard · 111 m away
- 1900 Watchhill RdJun 1, 2026Replace sewer yard line from house connection to city tap · 118 m away
- 2305 Newfield LnApr 17, 2026Replace sewer yard line from house connection to city tap · 120 m away