3001 Windsor Rd
Austin, TX 78703
3001 Windsor Rd: 4 projects on record
City of Austin lists 4 filings across 4 projects at 3001 Windsor Rd, Austin, TX 78703 since February 20, 2024. The most recent, filed March 6, 2024, covers: “Interior remodel and new bathroom addition”.
Compiled from City of Austin records · updated Mar 6, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Mar 6, 2024
- since Feb 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel and new bathroom addition
- AppliedMar 13, 2023
- IssuedMar 6, 2024
- WorkMar '24 – Sep '24
- Final inspectionSep 4, 2024
Passed final inspection Sep 4, 2024.
1 contact on this project
Permit & project history
4 projectsInterior remodel and new bathroom addition
Interior remodel and new bathroom addition
City of Austin permitMechanical PermitFinal- Record
- 2023-088337 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel and new bathroom addition
Interior remodel and new bathroom addition
City of Austin permitPlumbing PermitFinal- Record
- 2023-088337 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel and new bathroom addition. 6/14/24 sm *** revised *** full remodel of both units a and b
Interior remodel and new bathroom addition. 6/14/24 sm *** revised *** full remodel of both units a and b
City of Austin permitElectrical PermitFinal- Record
- 2023-088337 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Homebuilder loop t-pole 2023-088337 bp
Homebuilder loop t-pole 2023-088337 bp
City of Austin permitElectrical PermitFinal- Record
- 2023-143044 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3001 Windsor Rd
What is being built at 3001 Windsor Rd?
The latest filing (City of Austin permit 2023-088337 MP, March 6, 2024) covers interior remodel and new bathroom addition.
How many permits and filings does 3001 Windsor Rd have?
4 filings across 4 projects, from February 20, 2024 to March 6, 2024.
Is there other construction near 3001 Windsor Rd?
Yes. Nearby filings include 2108 Elton Ln (replacement of complete existing central heat and air system with or without duct work, Jun 6, 2025); 3007 Windsor Rd (replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton gas horizontal (upstairs), Aug 4, 2026); 2207 Forest Trl (express: replace 1 window like for like, May 22, 2024).
How do I get alerts for new permits at 3001 Windsor Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 2108 Elton LnJun 6, 2025Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 3007 Windsor RdAug 4, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton gas horizontal (upstairs) · 37 m away
- 2207 Forest TrlMay 22, 2024Express: replace 1 window like for like · 46 m away
- 2201 Forest TrlSep 16, 2026Replacement of an existing water heater replacing gas water heater with similar model · 52 m away
- 2107 Forest TrlJun 12, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 4 ton ac system and supply & return plenum · 64 m away
- 2408 Keating LnJul 2, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 2410 Keating LnApr 17, 2026Replacement of complete existing central heat and air system with or without duct work main system change out only · 82 m away
- 3014 Windsor RdNov 5, 2026Building. 2: new 2-story 2 bedroom 2.5 bathroom dwelling unit with attached carport covered front porch and covered awnings · 85 m away
- 2202 Forest TrlJun 20, 2024Replacement of complete existing central heat and air system · 88 m away
- 2208 Forest TrlNov 10, 2026Construct new driveway approach of 16 ft and curb & gutter of 15 ft. no sidewalk inspection per plan review · 92 m away
- 2200 Forest TrlNov 4, 2024Remodel and addition to existing sfr. the additional conditioned area added to both the first and second floors. a covered terrace to added to ground floor revised ** 10/25/24 sm - full gut remodel except for kitchen and full bath fixtures and countertops. new primary bath and powder bath. all new ductwork and hvac · 93 m away
- 3016 Windsor RdNov 18, 2026Hbl temporary construction loop for demolition and reconstruction of residential structure · 104 m away