33 Woodstone Sq
Austin, TX 78703
Like-for-like HVAC replacement at 33 Woodstone Sq
A like-for-like replacement of the existing central heat and air system at 33 Woodstone Sq was permitted in Austin on February 27, 2026. The permit describes a 2-ton vertical gas system serving the downstairs and is marked final.
Summarized from City of Austin records · updated Feb 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 27, 2026
- since Feb 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system (downstairs)
- AppliedJan 15, 2026
- IssuedFeb 27, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 11, 2026
Passed final inspection Mar 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system (downstairs)
Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system (downstairs)
City of Austin permitMechanical PermitFinal- Record
- 2026-005820 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 33 Woodstone Sq
What work was permitted at 33 Woodstone Sq in Austin?
A City of Austin mechanical permit covers replacement of the existing central heat and air system with a like-for-like 2-ton vertical gas system downstairs. Permit 2026-005820 MP was filed February 27, 2026.
When was the HVAC replacement at 33 Woodstone Sq permitted?
The City of Austin permit was filed on February 27, 2026. Permit 2026-005820 MP is marked final.
What type of heating and cooling system is being installed at 33 Woodstone Sq?
The permit describes a 2-ton vertical gas system downstairs, replacing the existing central heat and air system like for like.
Is a new home being built at 33 Woodstone Sq?
The available permit record describes replacement of an existing heating and cooling system, not construction of a new home.
What does permit 2026-005820 MP cover?
It is a City of Austin mechanical permit for a like-for-like replacement of the existing central heat and air system at 33 Woodstone Sq. The permit was filed February 27, 2026, and is marked final.
Also being built nearby
All of 78703- 27 Woodstone SqOct 15, 2026Interior remodel to existing single-family condominium. reconfiguration of both first and second levels · 38 m away
- 3421 Pecos StDec 9, 2025Replacement of an existing water heater replacing a 40 gallon water heater with a 40 gallon water heater · 75 m away
- 4 Woodstone SqJan 2, 2026***timed virtual inspection: 01/20/2025 @ 10 am*** replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal greenspeed heatpump system · 75 m away
- 44 Woodstone SqJan 3, 2025Replacement of complete existing central heat and air system with or without duct work residential changeout · 102 m away
- 3401 Timberwood CirNov 15, 2023Add new gas line from meter to gas generator location. gas pressure test on gas system · 113 m away
- 3111 W 35th StJun 10, 2026Installation of external awning for a newly constructed 240 square foot building (2022-073104 bp) · 117 m away
- 21 Woodstone SqJun 10, 2025Interior remodel exterior door and window replacement-no structural work · 121 m away
- 8 Woodstone SqMay 28, 2025Replace old main service panel & meter can · 141 m away
- 3204 Warren StOct 3, 2025Construct new type lll driveway approach of 19.1 ft · 150 m away
- 17 Woodstone SqFeb 28, 2025Replacement of complete existing central heat and air system with or without duct work · 151 m away
- 49 Woodstone SqMay 15, 2024Replacement of an existing water heater · 154 m away
- 3405 Timberwood CirFeb 13, 2024Replacement of an existing water heater · 161 m away