3405 Timberwood Cir
Austin, TX 78703
3405 Timberwood Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 3405 Timberwood Cir, Austin, TX 78703. The most recent, filed February 13, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Feb 13, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 13, 2024
- since Feb 13, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedFeb 7, 2024
- IssuedFeb 13, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 27, 2024
Passed final inspection Mar 27, 2024.
1 contact on this project
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-015703 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3405 Timberwood Cir
What is being built at 3405 Timberwood Cir?
The latest filing (City of Austin permit 2024-015703 PP, February 13, 2024) covers replacement of an existing water heater.
How many permits and filings does 3405 Timberwood Cir have?
1 filing across 1 project, from February 13, 2024 to February 13, 2024.
Is there other construction near 3405 Timberwood Cir?
Yes. Nearby filings include 3407 Timberwood Cir (upgrade pool controller from intelliconnect to intellicenter with built sub panel, Jun 17, 2024); 3410 Timberwood Cir (replace the cast iron drain line by way of a tunnel in the bathroom kitchen and laundry room, Jun 23, 2025); 3401 Timberwood Cir (add new gas line from meter to gas generator location. gas pressure test on gas system, Nov 15, 2023).
How do I get alerts for new permits at 3405 Timberwood Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 3407 Timberwood CirJun 17, 2024Upgrade pool controller from intelliconnect to intellicenter with built sub panel · 31 m away
- 3410 Timberwood CirJun 23, 2025Replace the cast iron drain line by way of a tunnel in the bathroom kitchen and laundry room · 61 m away
- 3401 Timberwood CirNov 15, 2023Add new gas line from meter to gas generator location. gas pressure test on gas system · 68 m away
- 3404 Timberwood CirMay 15, 2021Timberwood · 72 m away
- 3412 Timberwood CirMay 14, 2026We will be trenching and replacing a 25ft section of the sewer line · 80 m away
- 3421 Pecos StDec 9, 2025Replacement of an existing water heater replacing a 40 gallon water heater with a 40 gallon water heater · 97 m away
- 3111 W 35th StJun 10, 2026Installation of external awning for a newly constructed 240 square foot building (2022-073104 bp) · 103 m away
- 3501 Balcones DrJun 6, 2024Addition/remodel 1st floor covered porch enclosure to create dining room convert portion of garage to create utility 2nd floor frame area over entry to create utility reconfigure stairs convert utility to add bathroom remodel bed and bath remodel kitchen · 132 m away
- 3204 Warren StOct 3, 2025Construct new type lll driveway approach of 19.1 ft · 146 m away
- 3200 W 35th StOct 23, 2026Base: installing a backup battery system and additional meter socket · 147 m away
- 27 Woodstone SqOct 15, 2026Interior remodel to existing single-family condominium. reconfiguration of both first and second levels · 160 m away
- 33 Woodstone SqFeb 27, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system (downstairs) · 161 m away