1027 Riverside Dr
Austin, TX 78704
1027 Riverside Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1027 Riverside Dr, Austin, TX 78704. The most recent, filed March 2, 2007, covers: “1027 e. riverside drive”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1027 Riverside Dr
What is being built at 1027 Riverside Dr?
The latest filing (City of Austin case 155824, March 2, 2007) covers 1027 e. riverside drive.
How many permits and filings does 1027 Riverside Dr have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 1027 Riverside Dr?
Yes. Nearby filings include 1022 Harwood Pl (gas test, Jan 3, 2024); 1018 Harwood Pl (express: replace 3 windows like for like, Oct 21, 2026); 1109 E Riverside Dr (new pool (26x12) and spa (8x8). removing 219 sq ft of existing concrete deck and 15ft concrete pad, Dec 30, 2025).
How do I get alerts for new permits at 1027 Riverside Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 1022 Harwood PlJan 3, 2024Gas test · 38 m away
- 1018 Harwood PlOct 21, 2026Express: replace 3 windows like for like · 52 m away
- 1109 E Riverside DrDec 30, 2025New pool (26x12) and spa (8x8). removing 219 sq ft of existing concrete deck and 15ft concrete pad · 56 m away
- 1200 Kenwood AveAug 19, 2026Ev install · 73 m away
- 1014 Harwood PlJun 18, 2024Tesla home charger install 65 of panel · 82 m away
- 1303 Bonham TerFeb 12, 2026200-amp overhead service panel upgrade · 84 m away
- 1010 Harwood PlMay 10, 2025New inground swimming pool with reqd enclosure device · 109 m away
- 1008 Harwood PlJun 1, 2026Updated: meter pull to cut power requiring only the temporary pull of the meter itself. there will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. we only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. remove meter to cut power to the house. replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. reinstall meter to re-establish power to the house · 124 m away
- 1018 Edgecliff TerOct 25, 2024The norwood house project (with r spc-2018-0252ct) · 134 m away
- 1023 E Riverside DrJun 30, 2026Demolition of existing roof and walls - install new beam above garage doorway. proposed building of a 2 tier deck above garage. minor plumbing and electrical to add exterior sink and refrigerator electrical hook-up. please note: proposed deck is to be built over existing house footprint. no change to impervious · 154 m away
- 1306 Bonham TerJun 4, 2025Express - 3 windows - like for like · 155 m away
- 1010 Avondale RdDec 13, 2025Replace sewerline to city cleanout. replace building drain under house. replace waterline to city meter. replace waterlines under house · 157 m away