1107 Weathers Ln
Austin, TX 78704
1107 Weathers Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1107 Weathers Ln, Austin, TX 78704. The most recent, filed August 6, 2024, covers: “Change service conductors and 100 amp main breaker”.
Compiled from City of Austin records · updated Aug 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 6, 2024
- since Aug 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledChange service conductors and 100 amp main breaker
- AppliedJul 31, 2024
- IssuedAug 6, 2024
- WorkAug '24 – Sep '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectChange service conductors and 100 amp main breaker
Change service conductors and 100 amp main breaker
City of Austin permitElectrical PermitFinal- Record
- 2024-096246 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1107 Weathers Ln
What is being built at 1107 Weathers Ln?
The latest filing (City of Austin permit 2024-096246 EP, August 6, 2024) covers change service conductors and 100 amp main breaker.
How many permits and filings does 1107 Weathers Ln have?
1 filing across 1 project, from August 6, 2024 to August 6, 2024.
Is there other construction near 1107 Weathers Ln?
Yes. Nearby filings include 3003 Birdwood Cir (repair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away, Aug 26, 2024); 3002 Birdwood Cir (60 tunnel below the foundation to replace bathroom and kitchen run of cast iron drain lines. 2 access holes- front back, Oct 13, 2025); 3002 Ray Wood Dr (residential pool construction, Jul 25, 2024).
How do I get alerts for new permits at 1107 Weathers Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 3003 Birdwood CirAug 26, 2024Repair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away · 62 m away
- 3002 Birdwood CirOct 13, 202560 tunnel below the foundation to replace bathroom and kitchen run of cast iron drain lines. 2 access holes- front back · 77 m away
- 3002 Ray Wood DrJul 25, 2024Residential pool construction · 97 m away
- 3004 Ray Wood DrFeb 27, 2024New pool · 105 m away
- 2909 Corbin LnFeb 10, 2024Installing irrigation to existing residence only · 118 m away
- 2817 Corbin LnAug 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage horizontal gas · 125 m away
- 3003 Ray Wood DrSep 14, 2024Interior remodel remove exterior sliding glass door and non operable window the door will be walled in and the window will be made operable for ingress/egress · 139 m away
- 3100 Birdwood CirMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 177 m away
- 3006 Locke LnAug 30, 2025To install 27 solar panels and a battery · 189 m away
- 2903 Burning Oak DrJul 9, 2026This proposal addresses necessary electrical upgrades for the duplex located at 2903 burning oak dr austin tx 78704. the panel on the a side has a damaged buss and must be replaced. per city of austin requirements both a and b sides of the duplex will be upgraded. install two new 200amp meter cans (as required by city regulations) replace with two new 100 amp panels and 100 amp mains install one new larger gutter way per code provide all new breakers grounding upgrades per city code install two new surge protectors per city code add two telephone grounds per city code building a & b · 190 m away
- 3100 Locke LnMar 7, 2025Repair riser and meter can damaged due to ae pole leaning / oh wires pulled the riser crooked. 125a mcb panel to remain no upgrade or changes to load · 209 m away
- 3003 Leaning Oak CirJun 13, 2025This estimate is to expose the sewer system under the home approximately 65ft of pipe will be exposed and replaced. we will also install hangers to support the system and prevent movement of the lines. once the system is replaced we ill put system on test and have city inspector check the installation once we are completed. the line will be replaced with new 3in and 2in pvc · 216 m away