3003 Birdwood Cir
Austin, TX 78704
3003 Birdwood Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 3003 Birdwood Cir, Austin, TX 78704. The most recent, filed August 26, 2024, covers: “Repair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away”.
Compiled from City of Austin records · updated Aug 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 26, 2024
- since Aug 26, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away
- AppliedAug 19, 2024
- IssuedAug 26, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 9, 2024
Passed final inspection Sep 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away
Repair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away
City of Austin permitPlumbing PermitFinal- Record
- 2024-105327 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3003 Birdwood Cir
What is being built at 3003 Birdwood Cir?
The latest filing (City of Austin permit 2024-105327 PP, August 26, 2024) covers repair plumbing under the slab by tunneling. **the tunnel entrance is on the house going 60 feet. we have to replace the cast iron piping on the sewer line that is rotted away.
How many permits and filings does 3003 Birdwood Cir have?
1 filing across 1 project, from August 26, 2024 to August 26, 2024.
Is there other construction near 3003 Birdwood Cir?
Yes. Nearby filings include 3002 Ray Wood Dr (residential pool construction, Jul 25, 2024); 3004 Ray Wood Dr (new pool, Feb 27, 2024); 3002 Birdwood Cir (60 tunnel below the foundation to replace bathroom and kitchen run of cast iron drain lines. 2 access holes- front back, Oct 13, 2025).
How do I get alerts for new permits at 3003 Birdwood Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 3002 Ray Wood DrJul 25, 2024Residential pool construction · 40 m away
- 3004 Ray Wood DrFeb 27, 2024New pool · 44 m away
- 3002 Birdwood CirOct 13, 202560 tunnel below the foundation to replace bathroom and kitchen run of cast iron drain lines. 2 access holes- front back · 57 m away
- 1107 Weathers LnAug 6, 2024Change service conductors and 100 amp main breaker · 62 m away
- 3003 Ray Wood DrSep 14, 2024Interior remodel remove exterior sliding glass door and non operable window the door will be walled in and the window will be made operable for ingress/egress · 88 m away
- 3100 Birdwood CirMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 3006 Locke LnAug 30, 2025To install 27 solar panels and a battery · 132 m away
- 3100 Locke LnMar 7, 2025Repair riser and meter can damaged due to ae pole leaning / oh wires pulled the riser crooked. 125a mcb panel to remain no upgrade or changes to load · 148 m away
- 2909 Corbin LnFeb 10, 2024Installing irrigation to existing residence only · 153 m away
- 3005 Locke LnJan 12, 2024Replacement of complete existing central heat and air system with or without duct work · 174 m away
- 3007 Locke LnNov 7, 2025New pool · 176 m away
- 2817 Corbin LnAug 15, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2 stage horizontal gas · 182 m away