1113 Blair Way
Austin, TX 78704
HVAC and heat-pump water-heater replacements at 1113 Blair Way
City of Austin permits at 1113 Blair Way cover a replacement central heating and air system, filed Dec. 12, 2025, and a plug-in heat-pump water heater, filed Nov. 16, 2024. Both permits are marked final and describe equipment replacements, not new construction.
Summarized from City of Austin records · updated Dec 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 12, 2025
- since Nov 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedDec 9, 2025
- IssuedDec 12, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 17, 2025
Passed final inspection Dec 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-156188 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of old gas water heater with new plug-in heat pump water heater. old gas line was already capped by a plumber and a suitable 120v electrical connection already exists in the space. water supply lines coming into the back of the space behind the heater will be routed around to the side of the heater to facilitate the front connections in addition to adding a second more accessible shutoff expansion tank and vacuum breaker not part of the original installation. ducting for the heat pump will be routed to the adjacent living spaces as recommended by the manufacturer. existing t&p discharge pipe and pan drain will be used for the new install. the condensate line will use the existing pan drain line for discharge
Replacement of old gas water heater with new plug-in heat pump water heater. old gas line was already capped by a plumber and a suitable 120v electrical connection already exists in the space. water supply lines coming into the back of the space behind the heater will be routed around to the side of the heater to facilitate the front connections in addition to adding a second more accessible shutoff expansion tank and vacuum breaker not part of the original installation. ducting for the heat pump will be routed to the adjacent living spaces as recommended by the manufacturer. existing t&p discharge pipe and pan drain will be used for the new install. the condensate line will use the existing pan drain line for discharge
City of Austin permitPlumbing PermitFinal- Record
- 2024-151713 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1113 Blair Way
What is being built at 1113 Blair Way?
The permits describe home system upgrades: a replacement central heating and air system and a plug-in heat-pump water heater. They do not describe a new building.
What work was permitted at 1113 Blair Way in Austin?
A City of Austin permit covers replacing the central heat and air system, and another covers replacing a gas water heater with a plug-in heat-pump water heater.
When was the HVAC replacement permitted at 1113 Blair Way?
The HVAC permit, 2025-156188 MP, was filed Dec. 12, 2025, and is marked final.
When was the heat-pump water heater permitted at 1113 Blair Way?
The plumbing permit, 2024-151713 PP, was filed Nov. 16, 2024, and is marked final.
Is a new house being built at 1113 Blair Way?
The available permits describe replacement heating, air-conditioning, and water-heater equipment. They do not indicate a new house is being built.
Are the permits for 1113 Blair Way final?
Yes. Both City of Austin permits in the records are marked final: 2024-151713 PP for the water heater and 2025-156188 MP for the HVAC system.
Also being built nearby
All of 78704- 1119 Blair WayOct 7, 2024Express: bathroom remodels (2) - replace shower stall in master bath replace tub surround & valve in guest bath · 27 m away
- 3300 Locke LnFeb 24, 20263300 locke lane - install 59 lf of 6 pcv wastewater line from row to existing clean out near house · 66 m away
- 3208 Locke LnAug 16, 2024In ground swimming pool with required enclosure device for existing sfr · 69 m away
- 3302 Locke LnFeb 24, 20263302 locke lane -install70lf of 6 pcv wastewater line one 4 clean out from row to existing clean out near house · 70 m away
- 1209 Blair WayOct 15, 2025Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 77 m away
- 3107 Corbin LnSep 30, 2024Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 1211 Blair WaySep 2, 2025Express: replace 1 window like for like · 88 m away
- 1213 Blair WayOct 18, 2007The crossing at bouldin creek — the crossing at bouldin creek · 100 m away
- 3301 Locke LnSep 5, 2025In the solution we will be re-piping the entire home with pexs overhead. water reroute · 117 m away
- 3100 Corbin LnJun 7, 2024Replacement of an existing water heater · 139 m away
- 3100 Birdwood CirMay 15, 2024Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 1003 Cardinal LnDec 14, 2025Per tx gas we need to relocate the house line away from tankless electrical and window · 163 m away