1209 Blair Way
Austin, TX 78704
Central HVAC system replaced at 1209 Blair Way
A complete existing central heating and air system was replaced at 1209 Blair Way, without ductwork. The City of Austin permit was filed on October 15, 2025, and is marked final.
Summarized from City of Austin records · updated Oct 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 15, 2025
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
- AppliedOct 8, 2025
- IssuedOct 15, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 21, 2025
Passed final inspection Oct 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
City of Austin permitMechanical PermitFinal- Record
- 2025-130654 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1209 Blair Way
What work was done at 1209 Blair Way?
A complete existing central heat and air system was replaced without ductwork under City of Austin permit 2025-130654 MP.
When was the HVAC permit filed for 1209 Blair Way?
The City of Austin filed permit 2025-130654 MP on October 15, 2025.
Is the 1209 Blair Way permit final?
Yes. The City of Austin lists permit 2025-130654 MP as final.
Was ductwork replaced at 1209 Blair Way?
The permit description says the central heat and air system was replaced without ductwork.
Is a new building being constructed at 1209 Blair Way?
The available permit record describes replacement of an existing central HVAC system, not construction of a new building.
Also being built nearby
All of 78704- 1211 Blair WaySep 2, 2025Express: replace 1 window like for like · 11 m away
- 1213 Blair WayOct 18, 2007The crossing at bouldin creek — the crossing at bouldin creek · 23 m away
- 3107 Corbin LnSep 30, 2024Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 1119 Blair WayOct 7, 2024Express: bathroom remodels (2) - replace shower stall in master bath replace tub surround & valve in guest bath · 74 m away
- 1113 Blair WayDec 12, 2025Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 3100 Corbin LnJun 7, 2024Replacement of an existing water heater · 112 m away
- 3302 Locke LnFeb 24, 20263302 locke lane -install70lf of 6 pcv wastewater line one 4 clean out from row to existing clean out near house · 134 m away
- 3300 Locke LnFeb 24, 20263300 locke lane - install 59 lf of 6 pcv wastewater line from row to existing clean out near house · 137 m away
- 3205 Dolphin DrApr 11, 2024New pool for single family residence · 140 m away
- 3207 Dolphin DrApr 19, 2024Addition of front porch and master suite/remodel. living dining and kitchen renovation. front porch addition master suite addition · 142 m away
- 3208 Locke LnAug 16, 2024In ground swimming pool with required enclosure device for existing sfr · 144 m away
- 1402 Valleyridge DrAug 14, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4.5bath] with attached garage. building 3 · 150 m away