1400 St Edwards Dr
Austin, TX 78704
Drain line reroute permitted at 1400 St Edwards Dr
A City of Austin plumbing permit filed November 5, 2026, covers rerouting a drain line at 1400 St Edwards Dr. The permit record does not describe a new building or identify a project size or valuation.
Summarized from City of Austin records · updated Nov 5, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 5, 2026
- since Mar 17, 2010
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReroute drain line
- AppliedOct 28, 2026
- IssuedNov 5, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsReroute drain line
Reroute drain line
City of Austin permitPlumbing PermitActive- Record
- 2026-142605 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1400 St Edwards Dr
What is being built at 1400 St Edwards Dr?
The latest City of Austin record is a plumbing permit to reroute a drain line, filed November 5, 2026. It does not describe a new building.
What work is covered by permit 2026-142605 PP?
The permit description says “Reroute drain line.” It is listed as active and was filed November 5, 2026.
Is a new building planned at 1400 St Edwards Dr in Austin?
The records provided do not identify a new building project at this address. The latest filing is for rerouting a drain line.
What are the subdivision cases for 1400 St Edwards Dr?
The address has two older subdivision cases: Oltorf Village Sec 2 Resubdivision, filed in 2010, and Oltorf Village Section Two, Block B, Lot 1; Resubdivision, filed in 2011. Both are listed as expired.
When was the latest permit filed for 1400 St Edwards Dr?
The latest filing was permit 2026-142605 PP, filed November 5, 2026, for rerouting a drain line.
Also being built nearby
All of 78704- 2800 St Edwards CirJan 19, 2024Making a 100ft tunnel to replace the drainage lines · 44 m away
- 1401 St Edwards DrJul 8, 2025Emergency: fire occured in one apartment at building i. we need to restore gas to the building. we have tested the gas piping and it is holding pressure · 79 m away
- 1306 St Edwards DrApr 22, 2025Tunnel under foundation from the outside to replace cast iron for the entire duplex under the foundation that includes 2 full bathrooms 2 kitchen drain lines and 2 washer drain lines. there will be a total of 4 access holes to tunnel under foundation and total length of tunnel is 95 feet. we will also replace sewer line from the home to the city tap that is approximately 60 feet long · 81 m away
- 2711 St Edwards CirSep 16, 2024Replacement of an existing water heater · 124 m away
- 2716 St Edwards CirDec 13, 2024Gas pipe repair ran 5ft of 1 inch gas piping to replace former pipe with a leak · 144 m away
- 2610 S IH 35 Svrd SbSep 29, 2026Two-story addition to existing building · 167 m away
- 2610 South Interstate Highway-35 · Howerton Eye ClinicApr 25, 2024Howerton eye clinic (addition) — additions to existing building — a two-story addition to an existing clinic · 167 m away
- 2801 IH 35 SvrdMar 2, 2007Texas insurance advisory assn. office addition · 261 m away
- 2723 IH 35 SvrdMar 2, 2007"jet stop" convenience store · 279 m away
- 2512 S IH 35 Svrd SbApr 24, 2025New wall sign for dang law group · 291 m away
- 3017 IH 35 SvrdNov 30, 2007Texas village austin · 291 m away
- 3005 IH 35 SvrdAug 31, 2026Casulo hotel ii site development · 304 m away