groundranger
Historic · latest filing Jan 2024Residential

2800 St Edwards Cir

Austin, TX 78704

2800 St Edwards Cir: 1 project on record

City of Austin lists 1 filing across 1 project at 2800 St Edwards Cir, Austin, TX 78704. The most recent, filed January 19, 2024, covers: “Making a 100ft tunnel to replace the drainage lines”.

Compiled from City of Austin records · updated Jan 19, 2024

Projects
1
1 filings
Latest filing
Jan 19, 2024
since Jan 19, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Making a 100ft tunnel to replace the drainage lines

  1. AppliedJan 17, 2024
  2. IssuedJan 19, 2024
  3. WorkJan '24 – Feb '24
  4. Final inspectionFeb 13, 2024

Passed final inspection Feb 13, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Making a 100ft tunnel to replace the drainage lines

    Making a 100ft tunnel to replace the drainage lines

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2800 St Edwards Cir

What is being built at 2800 St Edwards Cir?

The latest filing (City of Austin permit 2024-006179 PP, January 19, 2024) covers making a 100ft tunnel to replace the drainage lines.

How many permits and filings does 2800 St Edwards Cir have?

1 filing across 1 project, from January 19, 2024 to January 19, 2024.

What is being built near Howerton Eye Clinic in Austin?

2800 St Edwards Cir is about 128 m from Howerton Eye Clinic (2610 South Interstate Highway-35). Its latest filing is for making a 100ft tunnel to replace the drainage lines.

Is there other construction near 2800 St Edwards Cir?

Yes. Nearby filings include 1400 St Edwards Dr (reroute drain line, Nov 5, 2026); 1306 St Edwards Dr (tunnel under foundation from the outside to replace cast iron for the entire duplex under the foundation that includes 2 full bathrooms 2 kitchen drain lines and 2 washer drain lines. there will be a total of 4 access holes to tunnel under foundation and total length of tunnel is 95 feet. we will also replace sewer line from the home to the city tap that is approximately 60 feet long, Apr 22, 2025); 2716 St Edwards Cir (gas pipe repair ran 5ft of 1 inch gas piping to replace former pipe with a leak, Dec 13, 2024).

How do I get alerts for new permits at 2800 St Edwards Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78704
Email me when a new permit is filed