2800 St Edwards Cir
Austin, TX 78704
2800 St Edwards Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2800 St Edwards Cir, Austin, TX 78704. The most recent, filed January 19, 2024, covers: “Making a 100ft tunnel to replace the drainage lines”.
Compiled from City of Austin records · updated Jan 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 19, 2024
- since Jan 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMaking a 100ft tunnel to replace the drainage lines
- AppliedJan 17, 2024
- IssuedJan 19, 2024
- WorkJan '24 – Feb '24
- Final inspectionFeb 13, 2024
Passed final inspection Feb 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectMaking a 100ft tunnel to replace the drainage lines
Making a 100ft tunnel to replace the drainage lines
City of Austin permitPlumbing PermitFinal- Record
- 2024-006179 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2800 St Edwards Cir
What is being built at 2800 St Edwards Cir?
The latest filing (City of Austin permit 2024-006179 PP, January 19, 2024) covers making a 100ft tunnel to replace the drainage lines.
How many permits and filings does 2800 St Edwards Cir have?
1 filing across 1 project, from January 19, 2024 to January 19, 2024.
What is being built near Howerton Eye Clinic in Austin?
2800 St Edwards Cir is about 128 m from Howerton Eye Clinic (2610 South Interstate Highway-35). Its latest filing is for making a 100ft tunnel to replace the drainage lines.
Is there other construction near 2800 St Edwards Cir?
Yes. Nearby filings include 1400 St Edwards Dr (reroute drain line, Nov 5, 2026); 1306 St Edwards Dr (tunnel under foundation from the outside to replace cast iron for the entire duplex under the foundation that includes 2 full bathrooms 2 kitchen drain lines and 2 washer drain lines. there will be a total of 4 access holes to tunnel under foundation and total length of tunnel is 95 feet. we will also replace sewer line from the home to the city tap that is approximately 60 feet long, Apr 22, 2025); 2716 St Edwards Cir (gas pipe repair ran 5ft of 1 inch gas piping to replace former pipe with a leak, Dec 13, 2024).
How do I get alerts for new permits at 2800 St Edwards Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 1400 St Edwards DrNov 5, 2026Reroute drain line · 44 m away
- 1306 St Edwards DrApr 22, 2025Tunnel under foundation from the outside to replace cast iron for the entire duplex under the foundation that includes 2 full bathrooms 2 kitchen drain lines and 2 washer drain lines. there will be a total of 4 access holes to tunnel under foundation and total length of tunnel is 95 feet. we will also replace sewer line from the home to the city tap that is approximately 60 feet long · 78 m away
- 2716 St Edwards CirDec 13, 2024Gas pipe repair ran 5ft of 1 inch gas piping to replace former pipe with a leak · 108 m away
- 2711 St Edwards CirSep 16, 2024Replacement of an existing water heater · 109 m away
- 1401 St Edwards DrJul 8, 2025Emergency: fire occured in one apartment at building i. we need to restore gas to the building. we have tested the gas piping and it is holding pressure · 123 m away
- 2610 S IH 35 Svrd SbSep 29, 2026Two-story addition to existing building · 128 m away
- 2610 South Interstate Highway-35 · Howerton Eye ClinicApr 25, 2024Howerton eye clinic (addition) — additions to existing building — a two-story addition to an existing clinic · 128 m away
- 2512 S IH 35 Svrd SbApr 24, 2025New wall sign for dang law group · 247 m away
- 2801 IH 35 SvrdMar 2, 2007Texas insurance advisory assn. office addition · 248 m away
- 2723 IH 35 SvrdMar 2, 2007"jet stop" convenience store · 253 m away
- 1626 Royal Hill DrNov 21, 2024Express: foundation repair- install exterior steel piers and level to limits patch all breakouts with new concrete · 301 m away
- 3017 IH 35 SvrdNov 30, 2007Texas village austin · 305 m away