2217 East Side Dr
Austin, TX 78704
2217 East Side Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2217 East Side Dr, Austin, TX 78704. The most recent, filed February 28, 2025, covers: “Express: replace tub to shower”.
Compiled from City of Austin records · updated Feb 28, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Feb 28, 2025
- since Feb 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: replace tub to shower
- AppliedFeb 28, 2025
- IssuedFeb 28, 2025
- WorkFeb '25 – Mar '25
- Final inspectionMar 17, 2025
Passed final inspection Mar 17, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress: replace tub to shower
Express: replace tub to shower
City of Austin permitBuilding PermitFinal- Record
- 2025-024529 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace tub to shower
Express: replace tub to shower
City of Austin permitPlumbing PermitFinal- Record
- 2025-024529 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2217 East Side Dr
What is being built at 2217 East Side Dr?
The latest filing (City of Austin permit 2025-024529 BP, February 28, 2025) covers express: replace tub to shower.
How many permits and filings does 2217 East Side Dr have?
2 filings across 2 projects, from February 28, 2025 to February 28, 2025.
Is there other construction near 2217 East Side Dr?
Yes. Nearby filings include 2218 East Side Dr (replacement of an existing water heater, Jul 17, 2025); 704 Buckingham Cir (replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system, Apr 28, 2025); 2214 East Side Dr (addition of existing sfr, Jan 14, 2025).
How do I get alerts for new permits at 2217 East Side Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2218 East Side DrJul 17, 2025Replacement of an existing water heater · 45 m away
- 704 Buckingham CirApr 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 50 m away
- 2214 East Side DrJan 14, 2025Addition of existing sfr · 74 m away
- 2214 Alta Vista AveMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 2211 East Side DrMar 24, 2025Existing service drop to main home to be reconnected on temp. meter loop while new structure is being built. new permanent service will be mounted on the new structure. main home to be re-fed from temp loop during construction and then eventually fed from new service on the new structure. ref: 2024 152309 bp · 86 m away
- 2210 East Side DrJul 31, 2025Replace tankless water heater · 112 m away
- 601 Sandringham CirOct 9, 2026Total demolition of sfr 1800 sq ft circa 1961 · 127 m away
- 2301 Rebel RdMay 23, 2024(dipaola tesla todd) installation of ev charger bi-directional capable - esip · 129 m away
- 2213 Rebel RdJun 13, 2025Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 2303 East Side DrNov 13, 2026Excavate 15 tunnel to repair the main drain under the house / excavate 75 trench to repair the main drain line in the yard · 133 m away
- 2206 East Side DrMay 22, 2026Inground spa (48sqft/41 in depth) please reference active tree permit 2024-124922-tp. tree protection is currently up and shall remain throughout the duration of construction · 134 m away
- 733 E Oltorf StApr 30, 2025***timed in-person inspection: 10/08/2025 @ 9 am*** replacement of complete existing central heat and air system with or without duct work · 165 m away