2218 East Side Dr
Austin, TX 78704
2218 East Side Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2218 East Side Dr, Austin, TX 78704. The most recent, filed July 17, 2025, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jul 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 17, 2025
- since Jul 17, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedJul 8, 2025
- IssuedJul 17, 2025
- WorkJul '25 – Feb '26
- Final inspectionFeb 23, 2026
Passed final inspection Feb 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-084162 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2218 East Side Dr
What is being built at 2218 East Side Dr?
The latest filing (City of Austin permit 2025-084162 PP, July 17, 2025) covers replacement of an existing water heater.
How many permits and filings does 2218 East Side Dr have?
1 filing across 1 project, from July 17, 2025 to July 17, 2025.
Is there other construction near 2218 East Side Dr?
Yes. Nearby filings include 2217 East Side Dr (express: replace tub to shower, Feb 28, 2025); 2214 East Side Dr (addition of existing sfr, Jan 14, 2025); 2301 Rebel Rd ((dipaola tesla todd) installation of ev charger bi-directional capable - esip, May 23, 2024).
How do I get alerts for new permits at 2218 East Side Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2217 East Side DrFeb 28, 2025Express: replace tub to shower · 45 m away
- 2214 East Side DrJan 14, 2025Addition of existing sfr · 57 m away
- 2301 Rebel RdMay 23, 2024(dipaola tesla todd) installation of ev charger bi-directional capable - esip · 85 m away
- 601 Sandringham CirOct 9, 2026Total demolition of sfr 1800 sq ft circa 1961 · 92 m away
- 704 Buckingham CirApr 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 95 m away
- 2211 East Side DrMar 24, 2025Existing service drop to main home to be reconnected on temp. meter loop while new structure is being built. new permanent service will be mounted on the new structure. main home to be re-fed from temp loop during construction and then eventually fed from new service on the new structure. ref: 2024 152309 bp · 98 m away
- 2213 Rebel RdJun 13, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 2210 East Side DrJul 31, 2025Replace tankless water heater · 102 m away
- 2214 Alta Vista AveMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 2206 East Side DrMay 22, 2026Inground spa (48sqft/41 in depth) please reference active tree permit 2024-124922-tp. tree protection is currently up and shall remain throughout the duration of construction · 129 m away
- 2302 Rebel RdOct 4, 2024Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 2303 East Side DrNov 13, 2026Excavate 15 tunnel to repair the main drain under the house / excavate 75 trench to repair the main drain line in the yard · 136 m away