2704 Friar Tuck Ln
Austin, TX 78704
2704 Friar Tuck Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 2704 Friar Tuck Ln, Austin, TX 78704. The most recent, filed December 8, 2023, covers: “Install an irrigation system to permit address”.
Compiled from City of Austin records · updated Dec 8, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2023
- since Dec 8, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall an irrigation system to permit address
- AppliedSep 1, 2022
- IssuedDec 8, 2023
- WorkDec '23 – Dec '23
- Final inspectionDec 18, 2023
Passed final inspection Dec 18, 2023.
Permit & project history
1 projectInstall an irrigation system to permit address
Install an irrigation system to permit address
City of Austin permitPlumbing PermitFinal- Record
- 2023-156932 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2704 Friar Tuck Ln
What is being built at 2704 Friar Tuck Ln?
The latest filing (City of Austin permit 2023-156932 PP, December 8, 2023) covers install an irrigation system to permit address.
How many permits and filings does 2704 Friar Tuck Ln have?
1 filing across 1 project, from December 8, 2023 to December 8, 2023.
Is there other construction near 2704 Friar Tuck Ln?
Yes. Nearby filings include 2706 Friar Tuck Ln (replace water heater 50 gal natural gas, Dec 16, 2025); 2702 Friar Tuck Ln (excavate 12 tunnel to repair break in main line, Jan 8, 2025); 2708 Friar Tuck Ln (construct new driveway approach of 12 ft, Oct 30, 2024).
How do I get alerts for new permits at 2704 Friar Tuck Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2706 Friar Tuck LnDec 16, 2025Replace water heater 50 gal natural gas · 18 m away
- 2702 Friar Tuck LnJan 8, 2025Excavate 12 tunnel to repair break in main line · 20 m away
- 2708 Friar Tuck LnOct 30, 2024Construct new driveway approach of 12 ft · 36 m away
- 2700 Friar Tuck LnJan 29, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review. **tas · 40 m away
- 2707 Friar Tuck LnSep 2, 2026We are installing a new irrigation system for an existing residential structure · 43 m away
- 2709 Friar Tuck LnJan 17, 2025Replacement of an existing water heater · 52 m away
- 2705 Sherwood LnAug 1, 202510ft tunnel under slab to repair cast iron break · 57 m away
- 2703 Sherwood LnNov 14, 20241-story primary suite addition with interior remodel. adding 2 bed/1 bath (total 5 bed/3 bath) uncovered wood deck amnesty certificate of occupancy for unpermitted existing 1-story addition with covered patio · 61 m away
- 2711 Sherwood LnAug 5, 2026Gunite swimming pool · 71 m away
- 2712 Friar Tuck LnMay 27, 2026Express: faucets and water heater install windows and doors replacements revision: requesting electrical -removing and installing new receptacles and switches checking 1 circuit for garbage disposal light fixtures and making the sub-panel safe. revision 2: plumbing work for existing water heater that was replaced · 76 m away
- 2713 Friar Tuck LnJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 2611 Friar Tuck LnMar 3, 2025Upgrade existing service to a 200 amp service. 120/240 v overhead single phase · 89 m away