2713 Friar Tuck Ln
Austin, TX 78704
Central heating and air system replacement at 2713 Friar Tuck Ln
A permit covers replacement of the existing central heating and air system at this residence, with or without ductwork. The City of Austin permit was filed June 1, 2026, and its status is Final.
Summarized from City of Austin records · updated Jun 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 1, 2026
- since Jun 1, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 22, 2026
- IssuedJun 1, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 1, 2026
Passed final inspection Jun 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-065216 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2713 Friar Tuck Ln
What is being done at 2713 Friar Tuck Ln?
A City of Austin mechanical permit covers replacement of the existing central heat and air system, with or without ductwork.
When was the HVAC permit filed for 2713 Friar Tuck Ln?
The permit was filed June 1, 2026. It is listed as permit 2026-065216 MP.
Is 2713 Friar Tuck Ln a new construction project?
The available record describes a replacement of the existing central heating and air system, not new construction.
What is the status of the 2713 Friar Tuck Ln permit?
The City of Austin lists mechanical permit 2026-065216 MP as Final.
Does the HVAC replacement at 2713 Friar Tuck Ln include ductwork?
The permit description says the system replacement is with or without ductwork; it does not specify whether ductwork is included.
Also being built nearby
All of 78704- 2712 Friar Tuck LnMay 27, 2026Express: faucets and water heater install windows and doors replacements revision: requesting electrical -removing and installing new receptacles and switches checking 1 circuit for garbage disposal light fixtures and making the sub-panel safe. revision 2: plumbing work for existing water heater that was replaced · 39 m away
- 2709 Friar Tuck LnJan 17, 2025Replacement of an existing water heater · 40 m away
- 601 St Edwards DrOct 23, 2024Upgrade existing 120/240v 200-amp service to 277/480v 400-amp service and install sports lighting on an existing soccer field · 51 m away
- 2708 Friar Tuck LnOct 30, 2024Construct new driveway approach of 12 ft · 54 m away
- 2707 Friar Tuck LnSep 2, 2026We are installing a new irrigation system for an existing residential structure · 58 m away
- 2708 Nottingham LnMay 7, 2025Upgrading/installing new meter can overhead ***emergency inspection done on 5/7/25-hyatt · 62 m away
- 2706 Nottingham LnAug 30, 2024Tunnel under foundation to replace cast iron drain lines for 2 bathrooms kitchen and washer drain line. total length of tunnel is about 50 feet two access holes will be made one on the back left side of the home the second on the back side of the home on the right. sewer line will also be replaced form the home to the city tap trench approximately 60 feet long · 68 m away
- 2706 Friar Tuck LnDec 16, 2025Replace water heater 50 gal natural gas · 69 m away
- 2704 Nottingham LnFeb 21, 2024Wire new 192 square foot pod in back yard · 79 m away
- 2704 Friar Tuck LnDec 8, 2023Install an irrigation system to permit address · 82 m away
- 2711 Sherwood LnAug 5, 2026Gunite swimming pool · 99 m away
- 2702 Friar Tuck LnJan 8, 2025Excavate 12 tunnel to repair break in main line · 101 m away