2708 Nottingham Ln
Austin, TX 78704
2708 Nottingham Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2708 Nottingham Ln, Austin, TX 78704. The most recent, filed May 7, 2025, covers: “Upgrading/installing new meter can overhead ***emergency inspection done on 5/7/25-hyatt”.
Compiled from City of Austin records · updated May 7, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 7, 2025
- since May 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrading/installing new meter can overhead ***emergency inspection done on 5/7/25-hyatt
- AppliedMay 6, 2025
- IssuedMay 7, 2025
- WorkMay '25 – May '25
- Final inspectionMay 8, 2025
Passed final inspection May 8, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsUpgrading/installing new meter can overhead ***emergency inspection done on 5/7/25-hyatt
Upgrading/installing new meter can overhead ***emergency inspection done on 5/7/25-hyatt
City of Austin permitElectrical PermitFinal- Record
- 2025-055997 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-089374 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2708 Nottingham Ln
What is being built at 2708 Nottingham Ln?
The latest filing (City of Austin permit 2025-055997 EP, May 7, 2025) covers upgrading/installing new meter can overhead ***emergency inspection done on 5/7/25-hyatt.
How many permits and filings does 2708 Nottingham Ln have?
2 filings across 2 projects, from May 7, 2025 to May 7, 2025.
Is there other construction near 2708 Nottingham Ln?
Yes. Nearby filings include 2706 Nottingham Ln (tunnel under foundation to replace cast iron drain lines for 2 bathrooms kitchen and washer drain line. total length of tunnel is about 50 feet two access holes will be made one on the back left side of the home the second on the back side of the home on the right. sewer line will also be replaced form the home to the city tap trench approximately 60 feet long, Aug 30, 2024); 2704 Nottingham Ln (wire new 192 square foot pod in back yard, Feb 21, 2024); 2709 Friar Tuck Ln (replacement of an existing water heater, Jan 17, 2025).
How do I get alerts for new permits at 2708 Nottingham Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2706 Nottingham LnAug 30, 2024Tunnel under foundation to replace cast iron drain lines for 2 bathrooms kitchen and washer drain line. total length of tunnel is about 50 feet two access holes will be made one on the back left side of the home the second on the back side of the home on the right. sewer line will also be replaced form the home to the city tap trench approximately 60 feet long · 18 m away
- 2704 Nottingham LnFeb 21, 2024Wire new 192 square foot pod in back yard · 36 m away
- 2709 Friar Tuck LnJan 17, 2025Replacement of an existing water heater · 56 m away
- 2713 Friar Tuck LnJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 2707 Friar Tuck LnSep 2, 2026We are installing a new irrigation system for an existing residential structure · 63 m away
- 2701 Nottingham LnDec 4, 2023Expedited review: addition to existing 1-story single family res [4bed 3bath]. work to include additional living room space new sun room and new bedroom · 86 m away
- 2708 East Side DrJul 14, 2025Disconnect/reconnect for electrical rebuild for new solar and battery installation at existing residence · 89 m away
- 2708 Friar Tuck LnOct 30, 2024Construct new driveway approach of 12 ft · 97 m away
- 2704 East Side DrFeb 3, 2026Replacement of an existing water heater replace 40-gallon gas water heater located in back closet of house · 97 m away
- 2712 Friar Tuck LnMay 27, 2026Express: faucets and water heater install windows and doors replacements revision: requesting electrical -removing and installing new receptacles and switches checking 1 circuit for garbage disposal light fixtures and making the sub-panel safe. revision 2: plumbing work for existing water heater that was replaced · 100 m away
- 2706 Friar Tuck LnDec 16, 2025Replace water heater 50 gal natural gas · 102 m away
- 2613 Nottingham LnOct 22, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4.5bath] with habitable attic covered porch uncovered wood deck and attached garage · 104 m away