400 Long Bow Ln
Austin, TX 78704
400 Long Bow Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 400 Long Bow Ln, Austin, TX 78704. The most recent, filed March 2, 2007, covers: “Travis county juvenile court parking garage”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 400 Long Bow Ln
What is being built at 400 Long Bow Ln?
The latest filing (City of Austin case 155591, March 2, 2007) covers travis county juvenile court parking garage.
How many permits and filings does 400 Long Bow Ln have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 400 Long Bow Ln?
Yes. Nearby filings include 406 Long Bow Ln (adding a solar pv rooftop system to an existing residence, Jul 9, 2024); 303 Oltorf St (mcdonalds (redevelopment), Mar 2, 2007); 201 Oltorf St (taco bell, Mar 2, 2007).
How do I get alerts for new permits at 400 Long Bow Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 406 Long Bow LnJul 9, 2024Adding a solar pv rooftop system to an existing residence · 70 m away
- 303 Oltorf StMar 2, 2007Mcdonalds (redevelopment) · 134 m away
- 201 Oltorf StMar 2, 2007Taco bell · 140 m away
- 2605 Carnarvon LnMar 12, 2026Replacement of complete existing central heat and air system with or without duct work · 147 m away
- 2608 Carnarvon LnMar 20, 2025Upgrade electrical service (300a) main distribution panel (150a) and revenue meter for unit 1 and unit 2 · 161 m away
- 2609 Carnarvon LnApr 6, 2026Eplan: residential expedited review - new two story duplex unit b 1-story [1bath] with attached garage · 180 m away
- 501 Oltorf StNov 24, 2008District at soco, the · 183 m away
- 2407 S Congress AveSep 14, 2026#130-160929 · 185 m away
- 2501 S Congress AveDec 13, 2024Replacement of complete existing central heat and air system with or without duct work bank of america- replace one trane hvac system with hot water coils · 188 m away
- 2608 Sherwood LnNov 15, 2026Replace sewer line from back yard to the clean out located on the left side of the home and down to the city tap connection. length of sewer line is a total of 70 feet and repipe and give proper fall to the sewer line · 206 m away
- 517 Oltorf StMar 2, 2007Apostolic faith child development center · 209 m away
- 601 Long Bow LnOct 10, 2025Construct new driveway approach of 16 ft · 209 m away