510 S Congress Ave
Austin, TX 78704
Sewer line repair permitted at 510 S Congress Ave
A sewer-line repair at 510 S Congress Ave involves a 40-foot tunnel and 50 feet of concrete breakup. The City of Austin issued plumbing permit 2024-101439 PP on August 22, 2024; the permit is marked final.
Summarized from City of Austin records · updated Aug 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2024
- since Aug 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled40 ft tunnel and 50 ft concrete breakup to repair sewer line. access point is clean out in front of egos bar
- AppliedAug 12, 2024
- IssuedAug 22, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 16, 2024
Passed final inspection Sep 16, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project40 ft tunnel and 50 ft concrete breakup to repair sewer line. access point is clean out in front of egos bar
40 ft tunnel and 50 ft concrete breakup to repair sewer line. access point is clean out in front of egos bar
City of Austin permitPlumbing PermitFinal- Record
- 2024-101439 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 510 S Congress Ave
What is being built at 510 S Congress Ave?
The City of Austin permit records show a sewer-line repair involving a 40-foot tunnel and 50 feet of concrete breakup. They do not describe a new building.
When was the sewer repair at 510 S Congress Ave permitted?
The City of Austin issued plumbing permit 2024-101439 PP on August 22, 2024. Its status is listed as final.
Is a new restaurant opening at 510 S Congress Ave?
The available permit describes sewer-line repair work, not a restaurant opening. It notes that the access point is a cleanout in front of Egos bar.
What's happening near Music Lane on South Congress?
A City of Austin permit for 510 S Congress Ave records a sewer-line repair. The permit was issued August 22, 2024, and is marked final.
Does the 510 S Congress Ave permit cover new construction?
The permit describes a 40-foot tunnel and 50 feet of concrete breakup to repair a sewer line. It does not list a new building or project size.
Also being built nearby
All of 78704- 515 S Congress AveAug 22, 2025Replace rpz at lobby soda machine (freebirds) · 63 m away
- 611 S Congress AveOct 16, 2026Demolition roof mechanical existing condensing unit and associated refrigerant piping. prepare roof penetrations for new piping. install new curbed outside air intake and install condensing unit. install new exhaust fan · 115 m away
- 110 E Riverside DrApr 24, 2026Replace sewer yard line from property connection to city tap · 122 m away
- 343 Congress AveMar 21, 2012343 south congress avenue · 147 m away
- 901 Congress AveAug 29, 2026South congress mixed use · 151 m away
- 127 Riverside DrMar 2, 2007Crescent machinery · 168 m away
- 907 Congress AveAug 22, 2023907 s congress ave · 181 m away
- 205 E Riverside Dr · 205-153 E. Riverside Property LLCNov 9, 2026Base hq lobby upgrade — renovation/alteration — entry lobby modification for the addition of (2) ada turnstile entrances · 184 m away
- 1007 South Congress Street · Music Lane 1007 Owners, LLCMar 12, 2024Birkenstock — renovation/alteration — retail tenant interior fit-out · 191 m away
- 1007 S. Congress Ve · Music Lane 1007 Owner, LPSep 19, 2024Vuori austin tx — renovation/alteration — 3,454 sq ft tenant improvement of an existing retail space, exterior street location. scope of work includes demolition and construction of interior non-load bearing partitions, doors, lighting, electrical, plumbing, mechanical, sprinkler, fire alarm · 191 m away
- 325 Congress AveNov 30, 2014Original city of austin, block 30, amended plats of 3,4 & 5 · 191 m away
- 1009 S. Congress Avenue · Music Lane Owner, LLCSep 24, 2026The friedkin group — renovation/alteration — build five new offices within the existing floor footprint, new flooring and paint. 7,000 sq ft · 194 m away
More restaurants in 78704.