5505 W Parmer Ln
Austin, TX 78704 · Apple INC Attn Real Estate & Facilities
Apple Building 5 registered for loading dock drain renovation
A renovation of the exterior loading dock drain at Apple’s Parmer Lane Building 5 was registered on March 26, 2025. The TDLR record lists 7,500 square feet and an applicant-estimated project cost of $250,000; its status is “Review Complete.”
Summarized from Texas Department of Licensing and Regulation records · updated Mar 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 26, 2025
- since Mar 26, 2025
- Largest scope
- 7,500 sf
- Estimated cost
- $250K
- state registration
Where this project stands
Finishing up · inspection nextApple PL05 Dock Drain Improvements
7,500 sq ft · $250K est.
- RegisteredMar 26, 2025
- Plan review
- ConstructionApr '25 – Aug '25
- Inspectednow
- Closed
Scheduled to finish Aug 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectExterior loading dock drain renovation — apple parmer lane building 5
TDLR project registrationRenovation/AlterationReview Complete7,500 sq ft$250K est.- Project #
- TABS2025015152
- Tenant / owner
- Apple Pl05 Dock Drain Improvements
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5505 W Parmer Ln
What is being built at 5505 W Parmer Ln?
A TDLR project registration describes an exterior loading dock drain renovation at Apple Parmer Lane Building 5. It was filed March 26, 2025, under project number TABS2025015152.
Is Apple building a new facility at 5505 W Parmer Ln?
The available registration is for a renovation, not a new facility. Its scope is described as exterior loading dock drain work at Building 5.
How much will the Apple Parmer Lane renovation cost?
The TDLR registration lists an applicant-estimated cost of $250,000 for the project. This is an estimate, not a reported final cost.
How large is the Apple Building 5 project?
The TDLR registration lists the project area as 7,500 square feet. The described work is an exterior loading dock drain renovation.
What is being renovated near Parmer Lane Garage 02?
The registration for 5505 W Parmer Ln describes exterior loading dock drain work at Apple Parmer Lane Building 5. Parmer Lane Garage 02 is also listed at 5505 W Parmer Lane.
Also being built nearby
All of 78704- 5505 W Parmer Lane · Apple, Inc.Mar 4, 2025Pl3.1 tenant improvement — renovation/alteration — architectural, mechanical, and electrical for the renovation of an existing open office space
- 5505 W Parmer Lane Garage 2 · Parmer Lane Garage 02Aug 20, 2025Parmer lane campus - ev chargers — renovation/alteration — scope is limited to the addition of electric vehicle chargers to serve 90 vehicles (45 dual chargers)
- 5505 West Parmer Lane · Apple Inc.Mar 4, 2026Big bend renovation — renovation/alteration — back of house renvoation of an existing auditorium/theater. - adding a control room behind the new megapixel screen - new camera additions around the theater - green room renovation - minor finish updates in the seating area of the theater
- 5505 W Parmer Lane Garage 3 · Parmer Lane Garage 03Aug 20, 2025Parmer lane campus - ev chargers — renovation/alteration — scope is limited to the addition of electric vehicle chargers to serve 46 vehicles (23 dual chargers)
- 5505 W Parmer Ln · Parmer Lane Building 04May 11, 2026Eplan review: remodel big bend auditorium - 1st floor
- 5501 W Parmer LnApr 22, 2026***per ec no work being done to existing service equipment permit only needed for ae fees. no inspection required by dsd -hyatt*** ae work order number 670110 is upgrading a utility transformer at 5501 west parmer lane. my scope is to turn the load off on the building thats affected and replace the meter can and provide new cts for the meter tech to do his scope. once ae work is complete i will work with the client with restoring the load and verifying building is on line and operational. fyi - if any new wire is pulled from the secondary side of the transforms ae will require an exterior main disconnect per joey h. & robert r · 18 m away
- 5501 W Parmer Lane Garage 1 · Parmer Lane Garage 01Aug 20, 2025Parmer lane campus - ev chargers — renovation/alteration — scope is limited to the addition of electric vehicle chargers to serve 64 vehicles (32 dual chargers) · 18 m away
- 5501 W Parmer Lane · Parmer Lane Building 2Jul 10, 2025Apple parmer lane lab tool hookup — renovation/alteration — scope is strictly limited to the tool hook-up requirements of previously permitted spaces. scope of work does not affect existing occupant loads, exiting or plumbing fixture counts · 18 m away
- 5400 Parmer LnMar 2, 2007Lodge at stone oak ranch - withdrawal and resubmittal · 98 m away
- 5505 Parmer LnNov 7, 2023Riata vista · 129 m away
- 5501 Parmer LnJan 21, 2022Riata vista office complex mga · 154 m away
- 5400 W Parmer LnApr 24, 2026Contractor will be replacing the meter jaws in a meter that is powering an apartment unit and the service disconnect. no espa needed due to meter can not being replaced-hyatt this is an emergency permit pull. there is a safety concern and will require the permit to be made by friday morning · 275 m away