5505 W Parmer Lane
Austin, TX 78727 · Pl3.1 Tenant Improvement, Apple Pl07.3 Hwt Lockdown
Office renovation registered at 5505 W Parmer Lane
A 4,870-square-foot renovation of an existing open office space is planned at 5505 W Parmer Lane in Austin. The TDLR project registration was filed March 4, 2025, and lists an applicant-estimated project cost of $300,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 4, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 4, 2025
- since Mar 4, 2025
- Largest scope
- 4,870 sf
- Estimated cost
- $300K
- state registration
Where this project stands
Finishing up · inspection nextPL3.1 Tenant Improvement
4,870 sq ft · $300K est.
- RegisteredMar 4, 2025
- Plan review
- ConstructionMar '25 – May '25
- Inspectednow
- Closed
Scheduled to finish May 16, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsArchitectural, mechanical, and electrical for the renovation of an existing open office space. — parmer lane 3
TDLR project registrationRenovation/AlterationReview Complete4,870 sq ft$300K est.- Project #
- TABS2025013238
- Tenant / owner
- Pl3.1 Tenant Improvement
- Design firm
- Pro
- Contact
- Pro
Install access controlled doors in employee occupied areas. — parmer lane building 7
TDLR project registrationRenovation/AlterationReview Complete200 sq ft$90K est.- Project #
- TABS2023020531
- Tenant / owner
- Apple Pl07.3 Hwt Lockdown
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5505 W Parmer Lane
What is being built at 5505 W Parmer Lane?
The project is a renovation of an existing open office space, with architectural, mechanical, and electrical work. The TDLR registration, TABS2025013238, was filed March 4, 2025.
Is a new office building planned at 5505 W Parmer Lane?
The registration describes renovation of an existing open office space, not construction of a new building. The project is listed as a renovation or alteration.
How large is the office renovation at 5505 W Parmer Lane?
The project registration lists an area of 4,870 square feet.
When was the 5505 W Parmer Lane project filed?
The TDLR registration was filed March 4, 2025. Its status is listed as Review Complete.
What is the estimated cost of the 5505 W Parmer Lane renovation?
The applicant's estimated cost for the project is $300,000.
What's being renovated near Parmer Lane Garage 02?
The TDLR registration describes a 4,870-square-foot renovation of an existing open office space at 5505 W Parmer Lane, alongside Parmer Lane Garage 02.
Also being built nearby
All of 78727- 5505 W Parmer Ln · Apple INC Attn Real Estate & FacilitiesMar 26, 2025Apple pl05 dock drain improvements — renovation/alteration — exterior loading dock drain renovation
- 5505 W Parmer Lane Garage 2 · Parmer Lane Garage 02Aug 20, 2025Parmer lane campus - ev chargers — renovation/alteration — scope is limited to the addition of electric vehicle chargers to serve 90 vehicles (45 dual chargers)
- 5505 West Parmer Lane · Apple Inc.Mar 4, 2026Big bend renovation — renovation/alteration — back of house renvoation of an existing auditorium/theater. - adding a control room behind the new megapixel screen - new camera additions around the theater - green room renovation - minor finish updates in the seating area of the theater
- 5505 W Parmer Lane Garage 3 · Parmer Lane Garage 03Aug 20, 2025Parmer lane campus - ev chargers — renovation/alteration — scope is limited to the addition of electric vehicle chargers to serve 46 vehicles (23 dual chargers)
- 5505 W Parmer Ln · Parmer Lane Building 04May 11, 2026Eplan review: remodel big bend auditorium - 1st floor
- 5501 W Parmer LnApr 22, 2026***per ec no work being done to existing service equipment permit only needed for ae fees. no inspection required by dsd -hyatt*** ae work order number 670110 is upgrading a utility transformer at 5501 west parmer lane. my scope is to turn the load off on the building thats affected and replace the meter can and provide new cts for the meter tech to do his scope. once ae work is complete i will work with the client with restoring the load and verifying building is on line and operational. fyi - if any new wire is pulled from the secondary side of the transforms ae will require an exterior main disconnect per joey h. & robert r · 18 m away
- 5501 W Parmer Lane Garage 1 · Parmer Lane Garage 01Aug 20, 2025Parmer lane campus - ev chargers — renovation/alteration — scope is limited to the addition of electric vehicle chargers to serve 64 vehicles (32 dual chargers) · 18 m away
- 5501 W Parmer Lane · Parmer Lane Building 2Jul 10, 2025Apple parmer lane lab tool hookup — renovation/alteration — scope is strictly limited to the tool hook-up requirements of previously permitted spaces. scope of work does not affect existing occupant loads, exiting or plumbing fixture counts · 18 m away
- 5400 Parmer LnMar 2, 2007Lodge at stone oak ranch - withdrawal and resubmittal · 98 m away
- 5505 Parmer LnNov 7, 2023Riata vista · 129 m away
- 5501 Parmer LnJan 21, 2022Riata vista office complex mga · 154 m away
- 5400 W Parmer LnApr 24, 2026Contractor will be replacing the meter jaws in a meter that is powering an apartment unit and the service disconnect. no espa needed due to meter can not being replaced-hyatt this is an emergency permit pull. there is a safety concern and will require the permit to be made by friday morning · 275 m away
More offices in 78727.