5605 Nuckols Crossing Road
Austin, TX 78704 · Austin Independent School District
Widen Elementary renovation registered in November 2024
A renovation at Widen Elementary School was registered with the Texas Department of Licensing and Regulation on November 5, 2024. Plans include converting a classroom into a mental health center and counselor office, upgrading pre-K classrooms and restrooms, and replacing heating and cooling equipment. The applicant estimated the project cost at $1,037,254; the TDLR record lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2024
- since Nov 5, 2024
- Largest scope
- 4,500 sf
- Estimated cost
- $1.0M
- state registration
Where this project stands
CompletedWIDEN ELEMENTARY SCHOOL RENOVATION
4,500 sq ft · $1.0M est.
- RegisteredNov 5, 2024
- Plan review
- ConstructionFeb '25 – Jul '25
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConvert classroom into mental health center & counselor office, upgrade pre-k classrooms including restrooms, install solar window film at library corridor, replace water source heat pumps serving library corridor & gym, replace oa split system — widen elementary school
TDLR project registrationRenovation/AlterationProject Closed4,500 sq ft$1.0M est.- Project #
- TABS2025004925
- Tenant / owner
- Widen Elementary School Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5605 Nuckols Crossing Road
What is being renovated at 5605 Nuckols Crossing Road?
The Widen Elementary School project includes a classroom conversion for a mental health center and counselor office, pre-K classroom and restroom upgrades, and heating and cooling system work. TDLR registration TABS2025004925 was filed November 5, 2024.
What is being built at Widen Elementary School in Austin?
The project is a renovation, not a new school building. Plans include a mental health center and counselor office in a converted classroom, along with pre-K classroom upgrades.
When was the Widen Elementary renovation registered?
The project was registered with the Texas Department of Licensing and Regulation on November 5, 2024. The registration lists the project as closed.
What is the estimated cost of the Widen Elementary renovation?
The applicant's TDLR estimate for the project is $1,037,254. This is an estimate for the renovation.
Does the Widen Elementary project include HVAC work?
Yes. The project description includes replacing water source heat pumps serving the library corridor and gym, as well as replacing an outside-air split system.
Is solar being installed at Widen Elementary?
The project description says solar window film will be installed at the library corridor. It does not describe a solar panel installation.
Also being built nearby
All of 78704- 5520 Juniper Junction LnNov 29, 2023Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 5605 Nuckols Crossing Rd · Austin Independent School DistrictJul 7, 2025Remedial repairs to low-sloped modified bitumen roof sections a-03 - a-18 & a-23 and all metal roof sections for widen elementary school. see description attached for additional information · 101 m away
- 5765 Palo Blanco LnFeb 4, 2025Disconnect and reconnect of underground electrical utility line at trans pad for the upgrade of unit mounted electrical meter and upsizing of underground feeder wire from trans pad to support new 200 amp meter & main breaker panel · 103 m away
- 5812 Magnolia Mist LnSep 30, 2025Replacement of an existing water heater · 104 m away
- 5501 Mulberry Mist CtDec 23, 2024Install 29 (415w) roof mounted solar panels 12.035 kw solar service system tying into existing 200 amp rated msp · 133 m away
- 5103 Galen CtFeb 28, 2025Upgrading service from 125 to 200 · 136 m away
- 5828 Magnolia Mist LnMay 13, 2024Replacement of complete existing central heat and air system with or without duct work · 159 m away
- 5504 Arbor Ash CtJul 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton heat pump system · 168 m away
- 5908 Red Bud Ridge LnSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 171 m away
- 5901 Red Bud Ridge LnSep 30, 2025(lara cruz) - installation of circuit for elec. vehicle charging station - esip · 181 m away
- 5808 Arbor Pavilion LnNov 2, 2026Express: foundation repair adding plumbing permit · 183 m away
- 5501 Nuckols Crossing RdJul 22, 2014Arbor ridge condominiums · 184 m away
More gyms & fitness in 78704, offices in 78704, schools & daycares in 78704.