groundranger
Recent · latest filing Jul 2025Commercial

5605 Nuckols Crossing Rd

Austin, TX 78744 · Austin Independent School District

Widen Elementary permits cover classroom and entry renovations

City of Austin permits filed from April through June 2025 indicate renovation work at Widen Elementary, including converting a classroom into a mental health center and upgrading pre-K classrooms. Other permits cover a secured entry vestibule and heating, ventilation and air-conditioning work; a July 2025 roof-repair permit is listed as expired.

Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jul 7, 2025

Projects
11
11 filings
Latest filing
Jul 7, 2025
since Mar 2, 2007
Largest scope
1,000 sf
Estimated cost
$129K
state registration

Where this project stands

Permit expired

Remedial repairs to low-sloped modified bitumen roof sections a-03 - a-18 & a-23 and all metal roof sections for widen elementary school. see description attached for additional information

  1. AppliedJun 27, 2025
  2. IssuedJul 7, 2025
  3. !WorkJul '25 – Jan '26
  4. Final inspection

Marked expired Jan 5, 2026.

2 contacts on this project · 2 phone numbers

Permit & project history

11 projects
  1. Remedial repairs to low-sloped modified bitumen roof sections a-03 - a-18 & a-23 and all metal roof sections for widen elementary school. see description attached for additional information

    Remedial repairs to low-sloped modified bitumen roof sections a-03 - a-18 & a-23 and all metal roof sections for widen elementary school. see description attached for additional information

    City of Austin permitBuilding PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    Convert existing classroom into mental health center upgrade pre-k classrooms including restrooms install solar film at library corridor replace water source heat pumps serving library corridor gym and cafeteria replace one rooftop outside air ventilation unit serving classroom pods replacement of additional outside roof top units as budget allows

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes, mechanical, and electrical scope. — widen elementary school

    TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$129K est.
    Tenant / owner
    Widen Elementary School Secure Vestibule
    Design firm
    Pro
    Contact
    Pro
  10. NUCKOLS ELEMENTARY PORTABLE RELOCATION

    Nuckols elementary portable relocation

    City of Austin casesite_planClosed
    Record
    146029
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. WIDEN ELEMENTARY NEW PORTABLE

    Widen elementary new portable

    City of Austin casesite_planApproved and Released
    Record
    150961
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin · Texas Department of Licensing and Regulation

Questions about 5605 Nuckols Crossing Rd

What is being built at 5605 Nuckols Crossing Rd?

Permits indicate renovations at Widen Elementary, including a classroom conversion to a mental health center, pre-K classroom upgrades and a secured entry vestibule. They do not describe a new building.

What are the renovations at Widen Elementary?

The work includes converting an existing classroom into a mental health center, upgrading pre-K classrooms and restrooms, and renovating the administration and entry area for a secured vestibule. Permits were filed in April and May 2025.

Is Widen Elementary getting a mental health center?

A City of Austin building permit filed April 25, 2025 (2025-039937 BP) describes converting an existing classroom into a mental health center. Associated electrical, plumbing and mechanical permits were filed in May and June.

Is the entrance at Widen Elementary being renovated?

Yes. Permit 2025-050258 BP, filed May 1, 2025, describes renovations to the administration and entry area to provide a secured vestibule for students and staff.

What heating and cooling work is planned at Widen Elementary?

A mechanical permit filed June 12, 2025 (2025-039937 MP) describes replacing heat pumps serving the library corridor, gym and cafeteria, along with rooftop ventilation equipment serving classroom pods.

Are roof repairs planned at 5605 Nuckols Crossing Rd?

A City of Austin permit filed July 7, 2025 (2025-082877 BP) describes repairs to sections of Widen Elementary's low-slope and metal roofs. The permit is listed as expired.

Also being built nearby

All of 78744

More gyms & fitness in 78744, schools & daycares in 78744, solar installs in 78744.

Email me when a new permit is filed