611 Bouldin Ave
Austin, TX 78704
611 Bouldin Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 611 Bouldin Ave, Austin, TX 78704. The most recent, filed March 14, 2025, covers: “Replace backflow preveneter”.
Compiled from City of Austin records · updated Mar 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 14, 2025
- since Mar 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace backflow preveneter
- AppliedFeb 18, 2025
- IssuedMar 14, 2025
- WorkMar '25 – Mar '25
- Final inspectionMar 19, 2025
Passed final inspection Mar 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace backflow preveneter
Replace backflow preveneter
City of Austin permitPlumbing PermitFinal- Record
- 2025-019731 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 611 Bouldin Ave
What is being built at 611 Bouldin Ave?
The latest filing (City of Austin permit 2025-019731 PP, March 14, 2025) covers replace backflow preveneter.
How many permits and filings does 611 Bouldin Ave have?
1 filing across 1 project, from March 14, 2025 to March 14, 2025.
Is there other construction near 611 Bouldin Ave?
Yes. Nearby filings include 804 Post Oak St (repair service for tree falling on service wire, Apr 22, 2026); 607 Bouldin Ave (replace water line from house to city meter, Sep 5, 2024); 805 Post Oak St (emergency repair of riser and meter only, May 19, 2025).
How do I get alerts for new permits at 611 Bouldin Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 804 Post Oak StApr 22, 2026Repair service for tree falling on service wire · 23 m away
- 607 Bouldin AveSep 5, 2024Replace water line from house to city meter · 33 m away
- 805 Post Oak StMay 19, 2025Emergency repair of riser and meter only · 40 m away
- 703 Bouldin AveMay 6, 2026Replacement of mini-split system · 54 m away
- 901 Post Oak StSep 16, 2026Eplan: residential expedited review - addition and remodel to create new 2-story+basement-level duplex from existing 2-story single family res. new basement-level unit (unit b) is added in existing basement crawl space & has 2 bedroom 3 bathroom additional bathroom for unit a (existing unit) is added in basement level · 60 m away
- 606 S 3rd StApr 16, 2026Replacement of an existing water heater · 66 m away
- 705 Bouldin AveJan 24, 2025Installation of two tesla powerwall batteries to an existing solar array system · 69 m away
- 902 Post Oak StNov 12, 202411x19 pool with ng heater and autofill · 73 m away
- 719 Post Oak StMay 30, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 600 Bouldin AveOct 16, 2025Per tx gas we need to remove the gas meter and relocate it from under the deck to the exterior portion of the house. highly combustible location where it sit now · 84 m away
- 904 Post Oak StJul 8, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 5bath] with a basement attached garage covered patio · 88 m away
- 500 S 3rd StJul 24, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 94 m away