Mini-split system replacement permitted at 703 Bouldin Ave
A mini-split system replacement was permitted at 703 Bouldin Ave on May 6, 2026. The City of Austin mechanical permit, 2026-055870 MP, is marked final. A separate subdivision case for the property was approved in 2009.
Summarized from City of Austin records · updated May 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 6, 2026
- since Feb 11, 2009
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of mini-split system
- AppliedMay 5, 2026
- IssuedMay 6, 2026
- WorkMay '26 – May '26
- Final inspectionMay 15, 2026
Passed final inspection May 15, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of mini-split system
Replacement of mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2026-055870 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 703 Bouldin Ave
What work was permitted at 703 Bouldin Ave?
A City of Austin mechanical permit records replacement of a mini-split system. The permit number is 2026-055870 MP.
When was the mini-split replacement permitted?
The permit is dated May 6, 2026, and is marked final.
Is a new building being constructed at 703 Bouldin Ave?
The 2026 permit describes replacement of a mini-split system, not new construction.
What is permit number 2026-055870 MP for?
It is the City of Austin mechanical permit for replacement of a mini-split system at 703 Bouldin Ave, dated May 6, 2026.
Was there a subdivision case for 703 Bouldin Ave?
Yes. City records show the Bennight Subdivision case, a resubdivision of James E. Bouldin Estates, was approved on February 11, 2009.
Also being built nearby
All of 78704- 705 Bouldin AveJan 24, 2025Installation of two tesla powerwall batteries to an existing solar array system · 21 m away
- 805 Post Oak StMay 19, 2025Emergency repair of riser and meter only · 36 m away
- 901 Post Oak StSep 16, 2026Eplan: residential expedited review - addition and remodel to create new 2-story+basement-level duplex from existing 2-story single family res. new basement-level unit (unit b) is added in existing basement crawl space & has 2 bedroom 3 bathroom additional bathroom for unit a (existing unit) is added in basement level · 45 m away
- 611 Bouldin AveMar 14, 2025Replace backflow preveneter · 54 m away
- 904 Retama StFeb 27, 2025Install evse · 68 m away
- 801 Bouldin AveJan 24, 2025Cap off water/wastewater total demolition of sfr 1483 sq ft circa 1940 · 68 m away
- 804 Post Oak StApr 22, 2026Repair service for tree falling on service wire · 74 m away
- 800 Bouldin AveAug 25, 2026Replacement of furnace only its an air handler not furnace. replacing indoor unit only · 77 m away
- 719 Post Oak StMay 30, 2024Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 907 Post Oak StNov 6, 2026Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 607 Bouldin AveSep 5, 2024Replace water line from house to city meter · 86 m away
- 902 Post Oak StNov 12, 202411x19 pool with ng heater and autofill · 90 m away