1202 W 22nd Half St
Austin, TX 78705
1202 W 22nd Half St: 1 project on record
City of Austin lists 1 filing across 1 project at 1202 W 22nd Half St, Austin, TX 78705. The most recent, filed April 7, 2025, covers: “Sewer line replacement from the home to the city tap connection a total of 70 feet long”.
Compiled from City of Austin records · updated Apr 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 7, 2025
- since Apr 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer line replacement from the home to the city tap connection a total of 70 feet long
- AppliedApr 7, 2025
- IssuedApr 7, 2025
- WorkApr '25 – May '25
- Final inspectionMay 13, 2025
Passed final inspection May 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer line replacement from the home to the city tap connection a total of 70 feet long
Sewer line replacement from the home to the city tap connection a total of 70 feet long
City of Austin permitPlumbing PermitFinal- Record
- 2025-041602 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1202 W 22nd Half St
What is being built at 1202 W 22nd Half St?
The latest filing (City of Austin permit 2025-041602 PP, April 7, 2025) covers sewer line replacement from the home to the city tap connection a total of 70 feet long.
How many permits and filings does 1202 W 22nd Half St have?
1 filing across 1 project, from April 7, 2025 to April 7, 2025.
Is there other construction near 1202 W 22nd Half St?
Yes. Nearby filings include 1204 W 22nd Half St (replacement of complete existing central heat and air system with or without duct work, Aug 20, 2024); 1206 W 22nd Half St (conversion of a detached garage into a studio. with a bathroom, Jun 24, 2026); 2311 Shoal Creek Blvd (express: replace 22 windows like for like, Feb 7, 2025).
How do I get alerts for new permits at 1202 W 22nd Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 1204 W 22nd Half StAug 20, 2024Replacement of complete existing central heat and air system with or without duct work · 16 m away
- 1206 W 22nd Half StJun 24, 2026Conversion of a detached garage into a studio. with a bathroom · 34 m away
- 2311 Shoal Creek BlvdFeb 7, 2025Express: replace 22 windows like for like · 50 m away
- 1201 W 22nd Half StSep 28, 2026Remove and replace angle stop guest bathroom sink · 57 m away
- 2305 Shoal Creek BlvdJan 22, 2025Replace all exterior siding change 6 sliding doors replace deck boards and add handrails to existing deck area. repair or replace any rotted deck framing- keeping the same deck layout as currently exist. pull meter can to allow siding to be installed behind main panel and reattached to structure · 65 m away
- 1115 W 22nd Half StJun 24, 2026Garage conversion to study and workout space including bathroom · 73 m away
- 2308 Longview StNov 18, 2024Replacement of an existing water heater · 87 m away
- 2202 Longview StDec 2, 2025Install level 2 ev charger · 93 m away
- 2305 Longview StJul 10, 2026Express: foundation repair · 99 m away
- 2307 Longview StOct 27, 2026Eplan: residential expedited review - new two unit res. building 1 new construction of a 2-story single family res. [5bed 5bath] with roof deck · 109 m away
- 2312 Shoal Creek BlvdMar 2, 2007Caswell tennis center (c.i.p. project) · 114 m away
- 1202 W 22nd StFeb 16, 2024Construct sidewalk of 63 lf · 124 m away