2202 Longview St
Austin, TX 78705
2202 Longview St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2202 Longview St, Austin, TX 78705 since October 28, 2025. The most recent, filed December 2, 2025, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Dec 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 2, 2025
- since Oct 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-150953 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Shutdown required for installation of tesla gateway 3v transfer switch. includes relocation of electrical service to section already determined by ae spotting team. service mast meter and main point of disconnect to be relocated from west-facing back wall to north-facing side wall of residence. existing 200a meter can to be replaced with new 200a bypass meter can. overhead service occupied residence. includes installation of level 2 ev charger
Shutdown required for installation of tesla gateway 3v transfer switch. includes relocation of electrical service to section already determined by ae spotting team. service mast meter and main point of disconnect to be relocated from west-facing back wall to north-facing side wall of residence. existing 200a meter can to be replaced with new 200a bypass meter can. overhead service occupied residence. includes installation of level 2 ev charger
City of Austin permitElectrical PermitWithdrawn- Record
- 2025-138140 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2202 Longview St
What is being built at 2202 Longview St?
The latest filing (City of Austin permit 2025-150953 EP, December 2, 2025) covers install level 2 ev charger.
How many permits and filings does 2202 Longview St have?
2 filings across 2 projects, from October 28, 2025 to December 2, 2025.
Is there other construction near 2202 Longview St?
Yes. Nearby filings include 1202 W 22nd St (construct sidewalk of 63 lf, Feb 16, 2024); 1201 W 22nd Half St (remove and replace angle stop guest bathroom sink, Sep 28, 2026); 1115 W 22nd Half St (garage conversion to study and workout space including bathroom, Jun 24, 2026).
How do I get alerts for new permits at 2202 Longview St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 1202 W 22nd StFeb 16, 2024Construct sidewalk of 63 lf · 33 m away
- 1201 W 22nd Half StSep 28, 2026Remove and replace angle stop guest bathroom sink · 37 m away
- 1115 W 22nd Half StJun 24, 2026Garage conversion to study and workout space including bathroom · 53 m away
- 1305 W 22nd StApr 22, 2024Express: replace 10 windows like for like · 69 m away
- 1110 W 22nd StJan 17, 2025Emergency ! we are replacing like for like for the meter. reason being austin energy disconnected power due to hazardous environment and sparks were coming out of the meter. since we are replacing the meter we will also be swapping out the main disconnect like for like · 83 m away
- 1202 W 22nd Half StApr 7, 2025Sewer line replacement from the home to the city tap connection a total of 70 feet long · 93 m away
- 1204 W 22nd Half StAug 20, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 1912 David StMay 7, 2024Installing a 50a nema3r receptacle enclosure for use as with a plug-in evse · 98 m away
- 1911 Cliff StOct 20, 2025Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 1206 W 22nd Half StJun 24, 2026Conversion of a detached garage into a studio. with a bathroom · 104 m away
- 1104 W 22nd StAug 14, 2024Irrigation · 129 m away
- 2305 Shoal Creek BlvdJan 22, 2025Replace all exterior siding change 6 sliding doors replace deck boards and add handrails to existing deck area. repair or replace any rotted deck framing- keeping the same deck layout as currently exist. pull meter can to allow siding to be installed behind main panel and reattached to structure · 135 m away