2200 Nueces St
Austin, TX 78705
2200 Nueces St: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2200 Nueces St, Austin, TX 78705 since February 5, 2009. The most recent, filed January 21, 2022, covers: “22nd & nueces mixed use project”.
Compiled from City of Austin records · updated Jan 21, 2022
- Projects
- 2
- 2 filings
- Latest filing
- Jan 21, 2022
- since Feb 5, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 2200 Nueces St
What is being built at 2200 Nueces St?
The latest filing (City of Austin case 11646125, January 21, 2022) covers 22nd & nueces mixed use project.
How many permits and filings does 2200 Nueces St have?
2 filings across 2 projects, from February 5, 2009 to January 21, 2022.
What is being built near Acc Op (west Campus) in Austin?
2200 Nueces St is about 119 m from Acc Op (west Campus) (505 W 22nd Street). Its latest filing is for 22nd & nueces mixed use project.
Is there other construction near 2200 Nueces St?
Yes. Nearby filings include 612 W 22nd St (612 west 22nd street austin tx 78705 repipe gas line running along the side of the building. were moving disposable gas line for a new gas line into crawl space and tie on the gas line under home. secure new gas line to the side of the building and test for proper function. remove 12 by 12 of rock free soil down to 12 below surface, Jul 17, 2025); 608 W 22nd St (replacement of an existing water heater, Jun 21, 2024); 2206 Nueces St (eplan - temporary building permits: for structural work from the ground floor slab to 65 - 0 in elevation, Jun 7, 2024).
How do I get alerts for new permits at 2200 Nueces St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 612 W 22nd StJul 17, 2025612 west 22nd street austin tx 78705 repipe gas line running along the side of the building. were moving disposable gas line for a new gas line into crawl space and tie on the gas line under home. secure new gas line to the side of the building and test for proper function. remove 12 by 12 of rock free soil down to 12 below surface · 19 m away
- 608 W 22nd StJun 21, 2024Replacement of an existing water heater · 20 m away
- 2206 Nueces StJun 7, 2024Eplan - temporary building permits: for structural work from the ground floor slab to 65 - 0 in elevation · 51 m away
- 2207 Nueces StJan 21, 2022Villas on nueces · 72 m away
- 2111 Rio Grande StNov 12, 2026Installation of new a/c unit -distributing into the elevator for floor 1 · 87 m away
- 2209 Rio Grande StMar 2, 2007Hardin house (smart housing) · 88 m away
- 2209 Nueces StMar 19, 2011Nueces retail center · 88 m away
- 714 W 22nd StDec 11, 202580 mil fleece-back tpo layover installation · 91 m away
- 2204 San Antonio StAug 30, 2026The intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell · 101 m away
- 2200 San Antonio StFeb 20, 2026Marvin gardens · 105 m away
- 2211 Nueces StSep 8, 20152211 atx · 105 m away
- 2102 Nueces StMar 2, 20074 apartment units · 116 m away