2204 San Antonio St
Austin, TX 78705
Pool shell reconstruction permitted at 2204 San Antonio St
City of Austin permit records indicate the reinforced concrete pool shell at 2204 San Antonio St is being reconstructed because the previous shell cracked. The building permit was filed July 21, 2025, followed by an electrical permit on February 5, 2026, and a plumbing permit on August 30, 2026. The permit description says demolition is limited to the pool shell and plumbing encased in it.
Summarized from City of Austin records · updated Aug 30, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Aug 30, 2026
- since Sep 13, 2018
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledThe intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
- AppliedJun 26, 2025
- IssuedAug 30, 2026
- WorkAug '26 – Sep '26
- Final inspectionSep 8, 2026
Passed final inspection Sep 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
7 projectsThe intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
The intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
City of Austin permitPlumbing PermitFinal- Record
- 2025-088319 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
The intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
The intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
City of Austin permitElectrical PermitFinal- Record
- 2025-088319 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
The intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
The intent of this project is to reconstruct the reinforced concrete pool shell due to cracking of the previous shell due to cracking of the previous shell. the owner intends to limit demolition to the pool shell and plumbing that is encased in the pool shell
City of Austin permitBuilding PermitFinal- Record
- 2025-088319 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gas test after repairing leaks. tx gas shutoff meter
Gas test after repairing leaks. tx gas shutoff meter
City of Austin permitPlumbing PermitFinal- Record
- 2024-039279 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2204 San Antonio St
What is being built at 2204 San Antonio St?
Permit records indicate that the existing reinforced concrete pool shell is being reconstructed after cracking. The description says demolition is limited to the pool shell and plumbing encased in it.
Is there a new pool planned at 2204 San Antonio St?
The permits describe reconstruction of the existing pool shell, not construction of a new pool. The building permit, 2025-088319 BP, was filed July 21, 2025.
When were permits filed for the pool work at 2204 San Antonio St?
The building permit was filed July 21, 2025; the electrical permit followed on February 5, 2026, and the plumbing permit on August 30, 2026. All three records are marked Final.
What is being demolished at 2204 San Antonio St?
The permit description says demolition is limited to the pool shell and the plumbing encased in it. It does not describe demolition of the entire building.
What construction is happening near Callaway House on West 22nd Street?
At 2204 San Antonio St, about 72 meters from Callaway House, Austin permit records describe reconstruction of a cracked reinforced concrete pool shell. The building permit was filed July 21, 2025.
What does permit 2025-088319 PP cover in Austin?
Permit 2025-088319 PP is a plumbing permit for the pool shell reconstruction at 2204 San Antonio St. It was filed August 30, 2026, and is marked Final.
Also being built nearby
All of 78705- 2200 San Antonio StFeb 20, 2026Marvin gardens · 44 m away
- 2207 Nueces StJan 21, 2022Villas on nueces · 46 m away
- 2209 Nueces StMar 19, 2011Nueces retail center · 54 m away
- 2211 Nueces StSep 8, 20152211 atx · 68 m away
- 505 W 22nd StJun 22, 2026Eplan: commercial expedited review - interior remodel to existing building to provide game room lounge and study area- 1st floor (4000 sq ft)) · 72 m away
- 505 W 22nd Street · Acc Op (west Campus) LPMar 26, 2026Callaway house — renovation/alteration — interior renovation · 72 m away
- 2214 San Antonio StJul 7, 2010University cooperative society · 79 m away
- 2206 Nueces StJun 7, 2024Eplan - temporary building permits: for structural work from the ground floor slab to 65 - 0 in elevation · 93 m away
- 608 W 22nd StJun 21, 2024Replacement of an existing water heater · 100 m away
- 2200 Nueces StJan 21, 202222nd & nueces mixed use project · 101 m away
- 2222 Guadalupe StNov 13, 2024Scope of work is a 6301 sq ft interior finish out with new cash wrap fixture new ceiling tiles flooring & trim throughout update 1 restroom to be ada complaint and existing millwork · 102 m away
- 612 W 22nd StJul 17, 2025612 west 22nd street austin tx 78705 repipe gas line running along the side of the building. were moving disposable gas line for a new gas line into crawl space and tie on the gas line under home. secure new gas line to the side of the building and test for proper function. remove 12 by 12 of rock free soil down to 12 below surface · 103 m away