3210 King St
Austin, TX 78705
3210 King St: 1 project on record
City of Austin lists 1 filing across 1 project at 3210 King St, Austin, TX 78705. The most recent, filed February 8, 2024, covers: “Sewer yard line from the house to city tap”.
Compiled from City of Austin records · updated Feb 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 8, 2024
- since Feb 8, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer yard line from the house to city tap
- AppliedFeb 5, 2024
- IssuedFeb 8, 2024
- WorkFeb '24 – Feb '24
- Final inspectionFeb 12, 2024
Passed final inspection Feb 12, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer yard line from the house to city tap
Sewer yard line from the house to city tap
City of Austin permitPlumbing PermitFinal- Record
- 2024-014264 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3210 King St
What is being built at 3210 King St?
The latest filing (City of Austin permit 2024-014264 PP, February 8, 2024) covers sewer yard line from the house to city tap.
How many permits and filings does 3210 King St have?
1 filing across 1 project, from February 8, 2024 to February 8, 2024.
Is there other construction near 3210 King St?
Yes. Nearby filings include 700 W 32nd St (new pool, Feb 26, 2025); 615 W 33rd St (replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork, Aug 8, 2025); 708 W 32nd St (we will excavate and tunnel approximately 3 feet underneath the pier-and-beam home to access the existing cast-iron drainage system. once exposed we will remove the leaking cast-iron tee fittings and defective sections of piping, Sep 25, 2026).
How do I get alerts for new permits at 3210 King St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 700 W 32nd StFeb 26, 2025New pool · 9 m away
- 615 W 33rd StAug 8, 2025Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 69 m away
- 708 W 32nd StSep 25, 2026We will excavate and tunnel approximately 3 feet underneath the pier-and-beam home to access the existing cast-iron drainage system. once exposed we will remove the leaking cast-iron tee fittings and defective sections of piping · 70 m away
- 711 W 32nd StJun 11, 2024***replace 4-bank meter pak on building e with (4) new individual 200a meter bases (4) 100a breaker enclosures and (1) wireway for the house meter unit 151 unit 152 and unit 153 because a component of the existing meter pak is faulty and cant be replaced · 75 m away
- 3301 Kings LnAug 27, 2025Kings lane residential · 93 m away
- 3201 West AveJun 1, 2026Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window · 105 m away
- 614 W 31st Half StMay 6, 2024Install new 9.085kw rooftop solar system for existing residential only · 111 m away
- 612 W 33rd StMay 22, 2026Install level 2 ev charger · 116 m away
- 607 W 33rd StJan 2, 2026Repair attic wiring to code · 132 m away
- 3301 West AveOct 14, 2026Cap off water and wastewater · 146 m away
- 639 W 31st Half StJun 17, 2026Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 807 W 32nd StOct 10, 2024Express: foundation repair · 150 m away