3301 Kings Ln
Austin, TX 78705
Residential site plan approved at 3301 Kings Lane
A residential project is planned at 3301 Kings Lane, according to an Austin site-plan case approved and released on August 27, 2025. The case, 13231498, is named “Kings Lane Residential”; the records provided do not specify the project’s size or number of homes.
Summarized from City of Austin records · updated Aug 27, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 27, 2025
- since Jul 25, 2019
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 3301 Kings Ln
What is being built at 3301 Kings Lane?
Austin records show a site-plan case named “Kings Lane Residential,” approved and released on August 27, 2025. The records provided do not list the project’s size or number of homes.
Has the residential plan at 3301 Kings Lane been approved?
Yes. Austin case 13231498 had a status of “Approved and Released” as of August 27, 2025.
When was the 3301 Kings Lane project filed?
The latest site-plan case, 13231498, is dated August 27, 2025. Earlier cases dated March 16, 2022, and July 25, 2019, are listed as expired.
How many homes are planned at 3301 Kings Lane?
The available Austin records do not state how many homes are planned.
What is planned near Elysian Medical Treatment Facility?
A residential site-plan case for 3301 Kings Lane, about 187 meters from the facility, was approved and released on August 27, 2025.
Also being built nearby
All of 78705- 3301 West AveOct 14, 2026Cap off water and wastewater · 65 m away
- 715 W 34th StOct 14, 2026Cap off water and waste water · 73 m away
- 615 W 33rd StAug 8, 2025Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 80 m away
- 3201 West AveJun 1, 2026Interior remodel of existing detached 1-story garage to 2 bedroom 2 bath accessory to primary structure; modify the roof to add a roof skylight window · 82 m away
- 708 W 32nd StSep 25, 2026We will excavate and tunnel approximately 3 feet underneath the pier-and-beam home to access the existing cast-iron drainage system. once exposed we will remove the leaking cast-iron tee fittings and defective sections of piping · 85 m away
- 710 W 34th StOct 24, 2024Replace old main disconnect panels with new main disconnect panels for building #1 units #101 201 102 202. we are not changing existing services or amps. we will need power/meter disconnected in order to replace main disconnect panels · 91 m away
- 3210 King StFeb 8, 2024Sewer yard line from the house to city tap · 93 m away
- 711 W 32nd StJun 11, 2024***replace 4-bank meter pak on building e with (4) new individual 200a meter bases (4) 100a breaker enclosures and (1) wireway for the house meter unit 151 unit 152 and unit 153 because a component of the existing meter pak is faulty and cant be replaced · 98 m away
- 700 W 32nd StFeb 26, 2025New pool · 100 m away
- 612 W 33rd StNov 14, 2026Base: installing a backup battery system and additional meter socket · 117 m away
- 807 W 32nd StOct 10, 2024Express: foundation repair · 134 m away
- 809 W 32nd StOct 22, 2026Replacement of complete existing central heat and air system with or without duct work · 136 m away