10424-1/2 Lakeline Mall Dr
Austin, TX 78717
10424-1/2 Lakeline Mall Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 10424-1/2 Lakeline Mall Dr, Austin, TX 78717. The most recent, filed January 21, 2022, covers: “Presidio ii”.
Compiled from City of Austin records · updated Jan 21, 2022
- Projects
- 1
- 1 filings
- Latest filing
- Jan 21, 2022
- since Jan 21, 2022
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 10424-1/2 Lakeline Mall Dr
What is being built at 10424-1/2 Lakeline Mall Dr?
The latest filing (City of Austin case 11682636, January 21, 2022) covers presidio ii.
How many permits and filings does 10424-1/2 Lakeline Mall Dr have?
1 filing across 1 project, from January 21, 2022 to January 21, 2022.
What is being built near Door Hospitality Lakeline in Austin?
10424-1/2 Lakeline Mall Dr is about 129 m from Door Hospitality Lakeline (10701 Lakeline Mall Drive). Its latest filing is for presidio ii.
Is there other construction near 10424-1/2 Lakeline Mall Dr?
Yes. Nearby filings include 10500 Lakeline Mall Dr (qt - remove and replace existing dumpster enclosure size for size. add new 10x20 concrete pad/walls for additional dumpster/recycling/composting - ova, Apr 6, 2026); 10425 Turnbull Loop (add dedicated 240v 50a circuit and hardwire wall mount charger, Feb 1, 2025); 10701 Lakeline Mall Drive (la quinta lakeline — renovation/alteration — interior remodeling consisting of new millwork at lobby, repainting, re-lamping, new desks at business center, and enlargement of fitness center area, Feb 21, 2024).
How do I get alerts for new permits at 10424-1/2 Lakeline Mall Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 10500 Lakeline Mall DrApr 6, 2026Qt - remove and replace existing dumpster enclosure size for size. add new 10x20 concrete pad/walls for additional dumpster/recycling/composting - ova · 100 m away
- 10425 Turnbull LoopFeb 1, 2025Add dedicated 240v 50a circuit and hardwire wall mount charger · 116 m away
- 10701 Lakeline Mall Drive · Door Hospitality Lakeline Inc.Feb 21, 2024La quinta lakeline — renovation/alteration — interior remodeling consisting of new millwork at lobby, repainting, re-lamping, new desks at business center, and enlargement of fitness center area · 129 m away
- 10509 Turnbull LoopNov 3, 2025Replacement of complete existing central heat and air system with or without duct work upstairs attic with pull down stairs · 134 m away
- 10520 Lakeline Mall DrJul 28, 2025Presidio iv (with r sp-2019-0468c) · 147 m away
- 10411 Turnbull LoopJan 13, 2026Replacement of an existing water heater · 154 m away
- 13500 Lyndhurst StJul 23, 2026Replacement of complete existing central heat and air system with or without duct work · 222 m away
- 13600 Lyndhurst StDec 4, 2014Crossings lot c · 237 m away
- 13500-1/2 Lyndhurst StNov 6, 2026Cip - lakeline blvd expansion · 259 m away
- 10236 Lakeline Mall Dr · Mark MazurNov 19, 2026Lakeline south medical office building · 263 m away
- 13621 Lyndhurst StMay 15, 2026Lakeline station multifamily south · 294 m away
- 13701 Lyndhurst StJul 10, 2026*** replacement permit for 2022 070274 ds. all work and inspection will be completed under this permit only*** original permit work scope- construct new 2 driveway approaches of 68 ft and 60 ft and sidewalk of 580 lf and curb & gutter of 40 ft. correction work scope(added by inspector)- sidewalk of 35 lf and curb & gutter of 40 ft. *** sidewalk work will be done in sections. will keep rest of the sidewalk open for pedestrian access. spc-2020-0323c 2022 167807 000 00 ssi · 316 m away