groundranger
Historic · latest filing Feb 2025Residential

10425 Turnbull Loop

Austin, TX 78717

10425 Turnbull Loop: 1 project on record

City of Austin lists 1 filing across 1 project at 10425 Turnbull Loop, Austin, TX 78717. The most recent, filed February 1, 2025, covers: “Add dedicated 240v 50a circuit and hardwire wall mount charger”.

Compiled from City of Austin records · updated Feb 1, 2025

Projects
1
1 filings
Latest filing
Feb 1, 2025
since Feb 1, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Add dedicated 240v 50a circuit and hardwire wall mount charger

  1. AppliedJan 23, 2025
  2. IssuedFeb 1, 2025
  3. WorkFeb '25 – Jul '25
  4. Final inspectionFeb 1, 2025

Passed final inspection Feb 1, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Add dedicated 240v 50a circuit and hardwire wall mount charger

    Add dedicated 240v 50a circuit and hardwire wall mount charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 10425 Turnbull Loop

What is being built at 10425 Turnbull Loop?

The latest filing (City of Austin permit 2025-008421 EP, February 1, 2025) covers add dedicated 240v 50a circuit and hardwire wall mount charger.

How many permits and filings does 10425 Turnbull Loop have?

1 filing across 1 project, from February 1, 2025 to February 1, 2025.

What is being built near Door Hospitality Lakeline in Austin?

10425 Turnbull Loop is about 245 m from Door Hospitality Lakeline (10701 Lakeline Mall Drive). Its latest filing is for add dedicated 240v 50a circuit and hardwire wall mount charger.

Is there other construction near 10425 Turnbull Loop?

Yes. Nearby filings include 10509 Turnbull Loop (replacement of complete existing central heat and air system with or without duct work upstairs attic with pull down stairs, Nov 3, 2025); 10411 Turnbull Loop (replacement of an existing water heater, Jan 13, 2026); 13500 Lyndhurst St (replacement of complete existing central heat and air system with or without duct work, Jul 23, 2026).

How do I get alerts for new permits at 10425 Turnbull Loop?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78717
Email me when a new permit is filed