15208 Fernhill Dr
Austin, TX 78717
15208 Fernhill Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 15208 Fernhill Dr, Austin, TX 78717. The most recent, filed March 2, 2007, covers: “Avery south sec 2 ph 3”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 15208 Fernhill Dr
What is being built at 15208 Fernhill Dr?
The latest filing (City of Austin case 252980, March 2, 2007) covers avery south sec 2 ph 3.
How many permits and filings does 15208 Fernhill Dr have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 15208 Fernhill Dr?
Yes. Nearby filings include 9332 Castle Pines Dr (replacement of complete existing central heat and air system with or without duct work, Oct 21, 2026); 9400 Castle Pines Dr (avery south sec 2 ph 1 — avery south sec 2 ph 1, Mar 2, 2007); 15217 Fernhill Dr (level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 40amp constant draw, Mar 24, 2025).
How do I get alerts for new permits at 15208 Fernhill Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 9332 Castle Pines DrOct 21, 2026Replacement of complete existing central heat and air system with or without duct work · 35 m away
- 9400 Castle Pines DrMar 2, 2007Avery south sec 2 ph 1 — avery south sec 2 ph 1 · 58 m away
- 15217 Fernhill DrMar 24, 2025Level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 40amp constant draw · 60 m away
- 15804 Belfin DrOct 1, 2024Replacement of an existing water heater · 61 m away
- 15800 Belfin DrJan 19, 2024Replacement of an existing water heater · 62 m away
- 9325 Castle Pines DrJun 8, 2026Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 9401 Castle Pines DrApr 18, 2024New inground pool · 90 m away
- 15704 Belfin DrDec 3, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 9413 Castle Pines DrFeb 27, 2026Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 15709 Belfin DrFeb 18, 2026Change out two tank water heaters for tankless · 128 m away
- 9225 Castle Pines DrMay 9, 2025Zhang - install new 6.08 kw rooftop solar system to existing residential only using line side tap utility company - pec · 136 m away
- 9420 Castle Pines DrApr 26, 2024Ev install · 139 m away