15704 Belfin Dr
Austin, TX 78717
15704 Belfin Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 15704 Belfin Dr, Austin, TX 78717. The most recent, filed December 3, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Dec 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2024
- since Dec 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 11, 2024
- IssuedDec 3, 2024
- WorkDec '24 – Mar '25
- Final inspectionMar 3, 2025
Passed final inspection Mar 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-150142 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 15704 Belfin Dr
What is being built at 15704 Belfin Dr?
The latest filing (City of Austin permit 2024-150142 MP, December 3, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 15704 Belfin Dr have?
1 filing across 1 project, from December 3, 2024 to December 3, 2024.
Is there other construction near 15704 Belfin Dr?
Yes. Nearby filings include 15709 Belfin Dr (change out two tank water heaters for tankless, Feb 18, 2026); 15800 Belfin Dr (replacement of an existing water heater, Jan 19, 2024); 15621 Belfin Dr (installation of new 8.600 kw dc / 7.600 kw ac roof-mounted photovoltaic solar system on existing single-family residence at 15621 belfin dr austin tx 78717. system consists of (20) mate solar ms430-54h 430w modules with (20) enphase iq8hc-72-m-dom-us microinverters arranged in two branch circuits of 10 modules each enphase iq combiner 40a/2p pv backfeed breaker and 60a visible lockable non-fused ac disconnect. existing 200a 120/240v single-phase service to remain. no main service panel upgrade and no battery/energy storage system. utility provider is pedernales electric cooperative (pec). interconnection is on the customer side of the meter through the existing main service panel, Aug 28, 2026).
How do I get alerts for new permits at 15704 Belfin Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 15709 Belfin DrFeb 18, 2026Change out two tank water heaters for tankless · 50 m away
- 15800 Belfin DrJan 19, 2024Replacement of an existing water heater · 71 m away
- 15621 Belfin DrAug 28, 2026Installation of new 8.600 kw dc / 7.600 kw ac roof-mounted photovoltaic solar system on existing single-family residence at 15621 belfin dr austin tx 78717. system consists of (20) mate solar ms430-54h 430w modules with (20) enphase iq8hc-72-m-dom-us microinverters arranged in two branch circuits of 10 modules each enphase iq combiner 40a/2p pv backfeed breaker and 60a visible lockable non-fused ac disconnect. existing 200a 120/240v single-phase service to remain. no main service panel upgrade and no battery/energy storage system. utility provider is pedernales electric cooperative (pec). interconnection is on the customer side of the meter through the existing main service panel · 77 m away
- 15804 Belfin DrOct 1, 2024Replacement of an existing water heater · 90 m away
- 15208 Fernhill DrMar 2, 2007Avery south sec 2 ph 3 — avery south sec 2 ph 3 · 104 m away
- 9908 Morgan Creek DrAug 12, 2026Replacement of an existing water heater · 106 m away
- 15613 Belfin DrApr 17, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system (downstairs) · 108 m away
- 15217 Fernhill DrMar 24, 2025Level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new emt conduit to power the level 2 ev charger at 40amp constant draw · 109 m away
- 15608 Belfin DrSep 15, 2026Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 9204 Laguna Woods DrApr 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 1.5 ton horizontal gas system · 132 m away
- 9332 Castle Pines DrOct 21, 2026Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 9400 Castle Pines DrMar 2, 2007Avery south sec 2 ph 1 — avery south sec 2 ph 1 · 141 m away