9800 Pasatiempo Dr
Austin, TX 78717
9800 Pasatiempo Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 9800 Pasatiempo Dr, Austin, TX 78717. The most recent, filed August 29, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 29, 2024
- since Aug 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 22, 2024
- IssuedAug 29, 2024
- WorkAug '24 – Oct '24
- Final inspectionOct 18, 2024
Passed final inspection Oct 18, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-107303 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9800 Pasatiempo Dr
What is being built at 9800 Pasatiempo Dr?
The latest filing (City of Austin permit 2024-107303 MP, August 29, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 9800 Pasatiempo Dr have?
1 filing across 1 project, from August 29, 2024 to August 29, 2024.
Is there other construction near 9800 Pasatiempo Dr?
Yes. Nearby filings include 9811 Pasatiempo Dr (replacement of an existing water heater, Jul 23, 2025); 15709 Pumpkin Ridge Dr (replacement of complete existing central heat and air system with or without duct work, Nov 30, 2023); 9725 Castle Pines Dr (replacement of complete existing central heat and air system with or without duct work, Feb 23, 2024).
How do I get alerts for new permits at 9800 Pasatiempo Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78717- 9811 Pasatiempo DrJul 23, 2025Replacement of an existing water heater · 59 m away
- 15709 Pumpkin Ridge DrNov 30, 2023Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 9725 Castle Pines DrFeb 23, 2024Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 9816 Castle Pines DrFeb 5, 2024Replacement of an existing water heater · 102 m away
- 15621 Pumpkin Ridge DrDec 20, 2024Replacement of an existing water heater · 105 m away
- 9524 Morgan Creek DrDec 19, 2024Express: remove and replace 27 windows (like for like) · 138 m away
- 9716 Castle Pines DrNov 26, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 9924 Pumpkin Ridge CtMay 15, 2026Upgrade main home electrical service and panel to 200amps · 147 m away
- 9909 Pumpkin Ridge CtOct 20, 2025Replacement of complete existing central heat and air system with or without duct work system located in attic with pull down stairs in garage · 160 m away
- 9908 Pumpkin Ridge CtDec 20, 2025Replacement of complete existing central heat and air system with or without duct work 3 ton gas 16.5 seer2 two stage and 2 ton gas 18 seer2 two stage · 178 m away
- 9608 Morgan Creek DrMay 20, 2025Express: replace existing tub/shower with acrylic base and walls. replace fixture and valve · 179 m away
- 9600 Pasatiempo DrJul 22, 2026Level 2 ev charger powered by a 50amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <40 feet new 3/4 emt conduit to power the level 2 ev charger at 40amp constant draw · 207 m away