groundranger
Recent · latest filing Dec 2025Residential

9908 Pumpkin Ridge Ct

Austin, TX 78717

EV charger and HVAC permits at 9908 Pumpkin Ridge Ct

City of Austin records show an EV charging station installation permit at this residence, filed July 30, 2024, and marked final. A permit filed December 20, 2025, covers replacement of the home's central heating and air conditioning system; that permit is listed as expired.

Summarized from City of Austin records · updated Dec 20, 2025

Projects
2
2 filings
Latest filing
Dec 20, 2025
since Jul 30, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Replacement of complete existing central heat and air system with or without duct work 3 ton gas 16.5 seer2 two stage and 2 ton gas 18 seer2 two stage

  1. AppliedDec 17, 2025
  2. IssuedDec 20, 2025
  3. !WorkDec '25 – Jun '26
  4. Final inspection

Marked expired Jun 19, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work 3 ton gas 16.5 seer2 two stage and 2 ton gas 18 seer2 two stage

    Replacement of complete existing central heat and air system with or without duct work 3 ton gas 16.5 seer2 two stage and 2 ton gas 18 seer2 two stage

    City of Austin permitMechanical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install evse

    Install evse

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9908 Pumpkin Ridge Ct

What work is happening at 9908 Pumpkin Ridge Ct?

Austin permit records show an EV charging station installation and a permit for replacing the home's central heating and air conditioning system. The HVAC permit is listed as expired.

Was an EV charger installed at 9908 Pumpkin Ridge Ct?

The City of Austin electrical permit describes an EVSE installation. Permit 2024-094853 EP was filed July 30, 2024, and its status is final.

Is the heating and air conditioning system being replaced at 9908 Pumpkin Ridge Ct?

A mechanical permit filed December 20, 2025, describes replacing the existing central heat and air system. Permit 2025-159915 MP is listed as expired.

When was the HVAC permit filed for 9908 Pumpkin Ridge Ct?

The City of Austin filed mechanical permit 2025-159915 MP on December 20, 2025. Its listed status is expired.

Are there permits for new construction at 9908 Pumpkin Ridge Ct?

The records provided list an EV charging station installation and an HVAC replacement permit. They do not list a new-construction permit.

Also being built nearby

All of 78717
Email me when a new permit is filed