Recent · latest filing Aug 2025Residential

1204 Sarabeth Way

Austin, TX 78721

Rooftop solar and battery storage added to Austin home

An additional 5.04-kW DC rooftop solar system and 15.0-kWh energy storage system are being installed at the existing residence. The City of Austin issued the electrical permit on August 29, 2025; the permit is marked final.

Summarized from City of Austin records · updated Aug 29, 2025

Projects
2
2 filings
Latest filing
Aug 29, 2025
since Aug 8, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install additional 5.04 kw dc rooftop solar system and 15.0 kwh energy storage system to existing residential

  1. AppliedAug 8, 2025
  2. IssuedAug 29, 2025
  3. WorkAug '25 – Mar '26
  4. Final inspectionSep 26, 2025

Passed final inspection Sep 26, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install additional 5.04 kw dc rooftop solar system and 15.0 kwh energy storage system to existing residential

    Install additional 5.04 kw dc rooftop solar system and 15.0 kwh energy storage system to existing residential

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect installation of transfer switch with 200 amp main on service with existing 200 amp panel and existing 200 amp meter can

    Request to disconnect installation of transfer switch with 200 amp main on service with existing 200 amp panel and existing 200 amp meter can

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1204 Sarabeth Way

What is being installed at 1204 Sarabeth Way?

A City of Austin permit describes an additional 5.04-kW DC rooftop solar system and 15.0-kWh energy storage system for the existing residence. Permit 2025-100404 EP was filed August 29, 2025.

Is 1204 Sarabeth Way a new home construction project?

The August 29, 2025 permit describes solar and energy storage work at an existing residence, not new home construction.

When was the solar permit filed for 1204 Sarabeth Way?

The City of Austin filed electrical permit 2025-100404 EP on August 29, 2025. Its status is final.

Is battery storage included in the project at 1204 Sarabeth Way?

Yes. The permit specifies a 15.0-kWh energy storage system alongside the additional rooftop solar system.

What other electrical permit was filed for 1204 Sarabeth Way?

Permit 2025-100352 EP, filed August 8, 2025, describes a request to disconnect an installation involving a transfer switch and a 200-amp main on service with an existing 200-amp panel and meter can. Its status is final.