2023 Airport Blvd
Austin, TX 78722 · Back 9 Austin, Airport Blvd Remodel + 1 more
Back 9 Austin tenant finish-out at 2023 Airport Blvd
A tenant finish-out for Back 9 Austin is planned in units 130 and 140 of the existing multi-tenant commercial building at 2023 Airport Blvd. The TDLR project registration was filed September 10, 2025, and describes about 2,400 square feet of work, with no new plumbing facilities or entrances. The registration lists an applicant-estimated project cost of $100,000 and an inspection-complete status.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 10, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Sep 10, 2025
- since Apr 23, 2024
- Largest scope
- 2,428 sf
- Estimated cost
- $175K
- state registration
Where this project stands
Inspected · closing outBack 9 Austin
2,400 sq ft · $100K est.
- RegisteredSep 10, 2025
- Plan review
- ConstructionMay '25 – Sep '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsTenant finish out of an existing space. no new plumbing facilities or entrances. one fully accessibly bathroom facility provided per code requirements. — unit 130 and 140
TDLR project registrationRenovation/AlterationInspection Complete2,400 sq ft$100K est.- Project #
- TABS2026000640
- Tenant / owner
- Back 9 Austin
- Design firm
- Pro
- Contact
- Pro
This project is a tenant improvement of two spaces in a single story commercial building. — airport blvd remodel
TDLR project registrationRenovation/AlterationInspection Complete2,428 sq ft$75K est.- Project #
- TABS2024016811
- Tenant / owner
- Airport Blvd Remodel
- Design firm
- Pro
- Contact
- Pro
Tenant finish-out. existing 3,009-sq ft commercial space will convert from automobile shop to food service (2,471 sq ft) and office space with coffee roaster (538 sq ft). — existing commercial
TDLR project registrationRenovation/AlterationProject Registered3,009 sq ft$175K est.- Project #
- TABS2023023508
- Tenant / owner
- Palomino Coffee LLC Interior Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2023 Airport Blvd
What is being built at 2023 Airport Blvd?
A tenant finish-out for Back 9 Austin is registered for units 130 and 140 in the existing multi-tenant commercial building. The project description says it does not add plumbing facilities or entrances.
Is Back 9 Austin opening at 2023 Airport Blvd?
The TDLR registration names Back 9 Austin for a tenant finish-out, but it does not state an opening date.
When was the Back 9 Austin project filed?
The TDLR registration, TABS2026000640, was filed September 10, 2025. Its listed status is Inspection Complete.
How much space is being renovated at 2023 Airport Blvd?
The Back 9 Austin registration lists 2,400 square feet in units 130 and 140.
How much will the 2023 Airport Blvd project cost?
The TDLR registration lists an applicant-estimated cost of $100,000 for the Back 9 Austin project.
What is being renovated near Mueller Village?
A tenant finish-out for Back 9 Austin is registered at 2023 Airport Blvd, about 183 meters from Mueller Village at 2201 Airport Boulevard. The registration was filed September 10, 2025.
Was there another remodel at 2023 Airport Blvd?
Yes. A separate TDLR registration for Airport Blvd Remodel was filed April 23, 2024, describing tenant improvements to two spaces in a single-story commercial building.
Also being built nearby
All of 78722- 2023 Airport BlvdJul 23, 2025New tenant improvement of two spaces in a single-story commercial building. new use will be indoor sports and recreation no mechanical work being performed
- 2035 Airport BlvdMar 2, 2007Network auto body & paint shop · 42 m away
- 2947 Eckert StOct 1, 2026Interior remodel - changing internal walls per architectural plan running new electrical plumbing and hvac. replacing sidings windows remodel bathrooms and kitchen retile and resurface bathrooms new cabinets and appliances replace flooring drywall doors trims replace ac units. demolition shed. replacing deck. landscaping. replacing driveway · 61 m away
- 2009 Airport BlvdJul 7, 2026Installing 73.70 kw dc (60.00 kw ac) solar system with 134 alexus alex-550-w-144-s panels and 1 sca60ktl-do/us-480 inverter · 65 m away
- 2039 Airport BlvdMay 6, 2025Airport blvd. business park redevelopment · 73 m away
- 2956 Higgins StOct 22, 2026Eplan: residential expedited review - new two units: building 2 new construction of 2-story single family res. [3bed 2.5bath] with attached carport · 81 m away
- 2942 Eckert StFeb 12, 2026*partial demolition* addition/interior remodel to single-story sfr · 85 m away
- 2943 Pannell StOct 4, 2024Total demolition of a 400-sq ft shed/carport circa 1948 · 89 m away
- 2954 Higgins StJun 27, 2025Replace approximately 80 feet of sewer line in the front yard · 89 m away
- 2943 Eckert StMay 9, 2024Express: exterior siding replacement · 91 m away
- 2952 Higgins StApr 9, 2025Replacement of an existing water heater water heater direct swap · 99 m away
- 2950 Higgins StNov 16, 2023Repair damaged overhead service taken by falling tree · 110 m away