2039 Airport Blvd
Austin, TX 78723
Expired site plan for Airport Boulevard business park redevelopment
A site plan for a business park redevelopment at 2039 Airport Blvd was filed on May 6, 2025, according to Austin records. The case is marked expired, and the records do not list a project size, cost estimate, or construction schedule.
Summarized from City of Austin records · updated May 6, 2025
- Projects
- 4
- 4 filings
- Latest filing
- May 6, 2025
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace burned meter blocks and meter socket
- AppliedJul 9, 2024
- IssuedJul 10, 2024
- WorkJul '24 – Jul '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplace burned meter blocks and meter socket
Replace burned meter blocks and meter socket
City of Austin permitElectrical PermitFinal- Record
- 2024-085260 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2039 Airport Blvd
What is being built at 2039 Airport Blvd?
Austin records show a site plan for the Airport Blvd. Business Park Redevelopment, filed May 6, 2025. The case is marked expired, and the records do not describe specific buildings or uses.
Is the Airport Boulevard business park redevelopment approved or underway?
The City of Austin case, number 272375, is marked expired. The records do not provide a construction schedule.
When was the redevelopment plan filed for 2039 Airport Blvd?
The City of Austin filed case 272375 on May 6, 2025, as a site plan for the Airport Blvd. Business Park Redevelopment.
What permits have been filed at 2039 Airport Blvd?
The records include a July 10, 2024, electrical permit, 2024-085260 EP, to replace burned meter blocks and a meter socket. Its status is final.
Is a new restaurant opening at 2039 Airport Blvd?
The available records do not identify a current restaurant opening. An earlier site plan filed in 2007 was named “New Restaurant and Pool Hall,” and a 2015 site plan was named “Skylark Lounge”; both cases are closed or expired.
What is being planned near Buffalo Wild Wings Go on Airport Boulevard?
A site plan for business park redevelopment was filed at 2039 Airport Blvd, about 158 meters from Buffalo Wild Wings Go at 2201 Airport Blvd. The redevelopment case is marked expired and does not specify proposed uses.
Also being built nearby
All of 78723- 2035 Airport BlvdMar 2, 2007Network auto body & paint shop · 33 m away
- 2023 Airport BlvdJul 23, 2025New tenant improvement of two spaces in a single-story commercial building. new use will be indoor sports and recreation no mechanical work being performed · 73 m away
- 2023 Airport Blvd · Jps Airport LLCSep 10, 2025Back 9 austin — renovation/alteration — tenant finish out of an existing space. no new plumbing facilities or entrances. one fully accessibly bathroom facility provided per code requirements · 73 m away
- 2022 Encino CirJul 31, 2025Gas test gasline spot repair under 5ft · 80 m away
- 2009 Airport BlvdJul 7, 2026Installing 73.70 kw dc (60.00 kw ac) solar system with 134 alexus alex-550-w-144-s panels and 1 sca60ktl-do/us-480 inverter · 94 m away
- 2028 Encino CirDec 19, 2023Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 2201 Airport BlvdSep 28, 2026First tenant improvement for buffalo wild wings 1270 sq ft · 127 m away
- 2943 Pannell StOct 4, 2024Total demolition of a 400-sq ft shed/carport circa 1948 · 131 m away
- 2947 Eckert StOct 1, 2026Interior remodel - changing internal walls per architectural plan running new electrical plumbing and hvac. replacing sidings windows remodel bathrooms and kitchen retile and resurface bathrooms new cabinets and appliances replace flooring drywall doors trims replace ac units. demolition shed. replacing deck. landscaping. replacing driveway · 134 m away
- 2942 Eckert StFeb 12, 2026*partial demolition* addition/interior remodel to single-story sfr · 148 m away
- 2956 Higgins StOct 22, 2026Eplan: residential expedited review - new two units: building 2 new construction of 2-story single family res. [3bed 2.5bath] with attached carport · 148 m away
- 2032 Encino CirFeb 6, 2024Replace existing 40-gallon natural gas water heater withn a new 40-gallon natural gas water heater · 152 m away